Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#3
![]() |
|||
|
|||
![]()
We were about to embark at Dover, when nowhere@com (Subterraneo) came up
to me and whispered: he platform extension works do indeed explain why the track cuts across the platform area. Thought it would be something like that. I'll pop up there myself sometime soon and have a look. -- Paul Cummins - Always a NetHead Wasting Bandwidth since 1981 IF you think this http://bit.ly/u5EP3p is cruel please sign this http://bit.ly/sKkzEx ---- If it's below this line, I didn't write it ---- |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Changing from NR to Northern Line at Moorgate | London Transport | |||
Road layout outside watford junction | London Transport | |||
Petition - M3 single lane restriction at the M25 Junction 12 andM3 New Road Layout Project | London Transport | |||
Track Charts or Track maps of the London Underground | London Transport | |||
Green Park layout | London Transport |