Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On 24 Oct, 20:24, "Peter Able" stuck@home wrote:
"Charles Ellson" wrote in message ... On Wed, 24 Oct 2012 09:31:37 -0700 (PDT), D7666 wrote: On Oct 24, 11:57 am, 77002 wrote: It really IS time to hand the fast pair over to NR/Chiltern and cut TfL back to Moor Park and Watford.- Hide quoted text - To acheive what ? Vary it to future upgrading in the form of 25kV from Marylebone to Aylesbury with DC left until further notice between Harrow and Amersham. This leaves roughly the same track availability as at present with the opportunity for future (whole/part) conversion of the Met to 25kV when the DC equipment is beyond saving, possible use of joint stock (i.e. including existing stock with new transformer coaches and new sets re-using displaced coaches from old sets). With the Met being diverted to Watford Junction and thoughts about extensions north of Aylesbury it would reduce the electrical incompatibility that LU has with surrounding systems. Stand on any up platform, Amersham to Moor Park inclusive, and observe how few passengers use the Chiltern services - so upgrading Aylesbury to Marylebone would yield no benefit to the overwhelming majority of these thousands of passengers. *Likewise with the god-forsaken idea of pushing the Met on into Watford Junction. *As for the conversion of the Met to OHLE - this is the loose sort of thinking that spawned IEP. I think you are saying most passengers do not want to reach Marylebone, and its interchange with the Bakerloo line. However, the addidion of a comprehensive interchange at West Hampstead would open up a multitude of possible destinations. |
#2
![]() |
|||
|
|||
![]() "e27002" wrote in message ... On 24 Oct, 20:24, "Peter Able" stuck@home wrote: "Charles Ellson" wrote in message ... On Wed, 24 Oct 2012 09:31:37 -0700 (PDT), D7666 wrote: On Oct 24, 11:57 am, 77002 wrote: It really IS time to hand the fast pair over to NR/Chiltern and cut TfL back to Moor Park and Watford.- Hide quoted text - To acheive what ? Vary it to future upgrading in the form of 25kV from Marylebone to Aylesbury with DC left until further notice between Harrow and Amersham. This leaves roughly the same track availability as at present with the opportunity for future (whole/part) conversion of the Met to 25kV when the DC equipment is beyond saving, possible use of joint stock (i.e. including existing stock with new transformer coaches and new sets re-using displaced coaches from old sets). With the Met being diverted to Watford Junction and thoughts about extensions north of Aylesbury it would reduce the electrical incompatibility that LU has with surrounding systems. Stand on any up platform, Amersham to Moor Park inclusive, and observe how few passengers use the Chiltern services - so upgrading Aylesbury to Marylebone would yield no benefit to the overwhelming majority of these thousands of passengers. Likewise with the god-forsaken idea of pushing the Met on into Watford Junction. As for the conversion of the Met to OHLE - this is the loose sort of thinking that spawned IEP. I think you are saying most passengers do not want to reach Marylebone, and its interchange with the Bakerloo line. However, the addidion of a comprehensive interchange at West Hampstead would open up a multitude of possible destinations. ----------------- Indeed they don't want Marylebone. What they want is Central London. That said, developing West Hampstead does seem to make sense. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Commute from Chesham to S. Bush via A40 - bad idea? | London Transport | |||
Chesham/Amersham changes decided | London Transport | |||
Marylebone Amersham via Beaconsfield | London Transport | |||
Chesham City trains doomed | London Transport | |||
Chiltern Services Between Amersham & Harrow | London Transport |