Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]() "77002" wrote in message ... On Oct 26, 12:28 pm, 77002 wrote: On Oct 26, 10:09 am, "Peter Able" stuck@home wrote: "Peter Masson" wrote in message ... "Jeremy Double" wrote in message ... Denis McMahon wrote: On Thu, 25 Oct 2012 09:28:58 +0100, Peter Able wrote: Dft: It takes over 15 minutes to attach a diesel locomotive. I've never understood this. If the diesel loco is properly designed to interwork with the unit(s) that it's expected to haul, then surely (de)coupling should take no longer than splitting and combining any *MU stock. In the days of ETH-fitted Peaks on the Midland main line, they used to reverse some trains at Nottingham in 5 minutes or so, and this included uncoupling a loco at one end of the train and coupling another one on the other end. Time was when 2 minutes were allowed to detach Sarah Siddons (or one of her sisters) at Rickmansworth, send her into a siding, back on a steam loco and couple up. The shunter had to go between the loco and the coaches, despite the presence of the 4th rail. These days H&S would have kittens. Peter I think that the issue is, if it does take more than 15 minutes - and it now appears that this figure was quite bogus - but whatever it takes, it is claimed to be due to the need for the train to re-boot and be acknowledged, then the question is why do we make such over-complicated systems nowadays? The same thing is true regarding 3rd-rail DC. The over-complicated systems cannot deal with momentary supply fluctuation such as occur during cold weather. This, combined with the foolish change to lightweight collector sandals (you really can't dignify them with the word, shoes) has lead to foolish condemnation of third-rail systems. In both cases, over-complication is the underlying problem - and no-one in DfT has the wit/guts to challenge this underlying, fundamental error - and no-one in the industry dares to. Corrected version: The light weight shoes are probably part of the reason NSR's EMUs fair so badly in snowy conditions. In the 1960s I can recall leaving Waterloo on a 4EPB during a light sprinkling. Even today SWT's Siemens units make some progress. NSR (an otherwise excellent railway) cancel services when there is snow in the forecast. Quite - and I can vouch for the even earlier 4SUBs, and even the pre-1920 3SUBs. There were pyrotechnics, but they got through. Nobody in the press seems to be recognising technical over-complication as a really serious issue, although I noted Tony Miles picking up on the issue of collector sandals as a bad move in a recent Modern Railways - an issue first raised in this group some time ago! |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Commute from Chesham to S. Bush via A40 - bad idea? | London Transport | |||
Chesham/Amersham changes decided | London Transport | |||
Marylebone Amersham via Beaconsfield | London Transport | |||
Chesham City trains doomed | London Transport | |||
Chiltern Services Between Amersham & Harrow | London Transport |