Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On Fri, 30 Nov 2012 10:20:39 +0000
Graeme Wall wrote: On 30/11/2012 10:03, d wrote: On Thu, 29 Nov 2012 22:28:16 +0000 Charles wrote: Yes :- http://www.flickr.com/photos/24772733@N05/5490835946/ Looking at the line on the left the 3rd rail presumably stops halfway down the platform, long before the overhead starts. This was obviously done deliberately but why? Surely it means anything electric has to be dragged to and from the 25kv and 3rd rail sections unless the driver gets some speed up first and hopes for the best! Except the right hand line has third rail at least up to the bridge the photo was taken from. Very strange Thats the dead end track isn't it? B2003 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
ELLX phase 2 | London Transport | |||
ELLX phase 2 | London Transport | |||
ELLX phase 2 | London Transport | |||
Latest official Crossrail Line Diagram | London Transport |