London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
Old November 30th 12, 10:35 AM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2009
Posts: 1,920
Default New LO in car line diagram for ELLX Phase 2

On Fri, 30 Nov 2012 10:20:39 +0000
Graeme Wall wrote:
On 30/11/2012 10:03, d wrote:
On Thu, 29 Nov 2012 22:28:16 +0000
Charles wrote:
Yes :-
http://www.flickr.com/photos/24772733@N05/5490835946/

Looking at the line on the left the 3rd rail presumably stops halfway
down the platform, long before the overhead starts. This was obviously
done deliberately but why? Surely it means anything electric has to be
dragged to and from the 25kv and 3rd rail sections unless the driver gets

some
speed up first and hopes for the best!


Except the right hand line has third rail at least up to the bridge the
photo was taken from. Very strange


Thats the dead end track isn't it?

B2003


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
ELLX phase 2 Mwmbwls London Transport 98 January 28th 08 09:03 AM
ELLX phase 2 Peter Masson London Transport 1 December 14th 07 08:26 PM
ELLX phase 2 Mizter T London Transport 0 December 14th 07 06:26 PM
Latest official Crossrail Line Diagram John Rowland London Transport 0 August 4th 04 10:10 AM


All times are GMT. The time now is 06:10 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017