Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
In article , ] (Steve
Fitzgerald) wrote: In message , writes They stopped allowing tube passengers from using HEx as an alternative ages ago. They also seem to have an awful lot of engineering possessions closing all four tracks between Hammersmith and Acton Town. 'an awful lot' being two in the past 12 months? Really? I've not been that way since August/September I must admit. It does make the choice of this weekend odder. Or was last weekend the other? -- Colin Rosenstiel |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Oyster PAYG and weekend engineering work | London Transport | |||
Weekend engineering work | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |