London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #8   Report Post  
Old February 19th 13, 09:22 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2012
Posts: 150
Default Southern Metro platform extensions (was TfL grant LOROL 2year extension)

On 18 Feb, 07:59, Neil Williams
wrote:
Recliner wrote:
They are ordering lots of new trains, but many are on behalf of DfT and
won't be used on Southern.


You could argue that they (and a small subset of their passengers) don't
deserve them. *The state of some of their Electrostars is disgusting
compared with LM's not all that much newer 350/1s which are always spotless
and without bits of panel hanging off, blown bulbs and graffiti in the
bogs.

That is really sad to hear. Maybe it is time to utilize the services
of a security firm. A "presence" on trains, platforms, and by the
line side, would bring the behavior under control.

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
8.5% cut in central govt grant to TfL; suburban West Anglia trainsto be devolved to TfL control Mizter T London Transport 52 July 7th 13 02:52 PM
GBP108 million cut to TfL's transport grant Mizter T London Transport 6 May 24th 10 05:53 PM
Chiltern platform extensions Dave Arquati London Transport 13 July 19th 04 10:22 AM


All times are GMT. The time now is 02:44 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017