London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #17   Report Post  
Old February 25th 13, 01:29 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2012
Posts: 21
Default Southern Metro platform extensions (was TfL grant LOROL 2 year extension)

SDO is normally used to allow one set of doors to be off the
platform, not an entire coach at each end.


The Southern 377s have the capability not to enable the doors on one or
maybe more coaches, and they make helpful automated (though not always
correct) announcements like 'Customers for XYZ should travel in the front 7
coaches; this is coach 4 of 8'.

Peter

--
|| Peter CS ~ Epsom ~ UK | pjcs02 [at] gmail.com |
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
8.5% cut in central govt grant to TfL; suburban West Anglia trainsto be devolved to TfL control Mizter T London Transport 52 July 7th 13 02:52 PM
GBP108 million cut to TfL's transport grant Mizter T London Transport 6 May 24th 10 05:53 PM
Chiltern platform extensions Dave Arquati London Transport 13 July 19th 04 10:22 AM


All times are GMT. The time now is 11:09 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017