Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#31
![]() |
|||
|
|||
![]()
On 2014\11\26 14:53, Roland Perry wrote:
In message , at 14:22:25 on Wed, 26 Nov 2014, David Cantrell remarked: Short platform lengths at some stations limit future lengthening. I don't understand this. Are people really too ****ing stupid to understand announcements like "passengers for Some Station must travel in the front four carriages"? Cos those work just fine elsewhere on the rail network. With ungangwayed 4-car units it's not always obvious which one you are in without getting out and having a look. I've even been on an 8-car (double 4-car) unit with a through gangway which was about to arrive at a splitting station and just to confuse everyone they'd already locked and closed the gangway. The answer is for separate warnings to be heard in separate carriages. |
#32
![]() |
|||
|
|||
![]()
In message , at 15:32:21 on Wed, 26 Nov
2014, Basil Jet remarked: Short platform lengths at some stations limit future lengthening. I don't understand this. Are people really too ****ing stupid to understand announcements like "passengers for Some Station must travel in the front four carriages"? Cos those work just fine elsewhere on the rail network. With ungangwayed 4-car units it's not always obvious which one you are in without getting out and having a look. I've even been on an 8-car (double 4-car) unit with a through gangway which was about to arrive at a splitting station and just to confuse everyone they'd already locked and closed the gangway. The answer is for separate warnings to be heard in separate carriages. Ha! That's for too complicated for train designers. -- Roland Perry |
#33
![]() |
|||
|
|||
![]() |
#34
![]() |
|||
|
|||
![]() |
#35
![]() |
|||
|
|||
![]() |
#36
![]() |
|||
|
|||
![]()
On Wed, Nov 26, 2014 at 02:53:15PM +0000, Roland Perry wrote:
In message , at 14:22:25 on Wed, 26 Nov 2014, David Cantrell remarked: Short platform lengths at some stations limit future lengthening. I don't understand this. Are people really too ****ing stupid to understand announcements like "passengers for Some Station must travel in the front four carriages"? Cos those work just fine elsewhere on the rail network. With ungangwayed 4-car units it's not always obvious which one you are in without getting out and having a look ... Hence all the "this is coach [pause] 5 [pause] of [pause] 8" announcements. -- David Cantrell | semi-evolved ape-thing If you can read this, thank a teacher. If you're reading it in English, thank Chaucer. |
#37
![]() |
|||
|
|||
![]()
On Wed, 26 Nov 2014 06:40:34 -0800 (PST)
Mark wrote: On Tuesday, 25 November 2014 19:06:56 UTC, wrote: I still think S stock running on the ELL as a tube route terminating at new cross + gate would have been a better choice despite extra traffic from further south since interchange would have been fairly easy. Where would the extra services from further south terminate? No terminating facility at New Cross Gate, and no capacity at London Bridge. They could have had reversers further up the line. Lets be honest - the real raison d'etre for the ELL now is to get people from highbury to shadwell or canada water to get to canary wharf so bypassing a huge chunk of central london. The south bit is mainly irrelevant since trains already went to london bridge where people could already get the jubilee anyway. Same applies for terminating from the north at New Cross Gate. Terminating 12 tph there would be challenging, perhaps not impossible but the knock-on effect of a problem would be far bigger than with multiple quieter terminuses. How do other tube lines cope then? Where there's a will... route. A train load of people changing at New Cross Gate would cause chaos there, even after they've finished rebuilding it. That logic didn't seem to stop the closure of the farringdon to moorgate branch so its odd TfL seem to think it applies in south london but not north london. South london is already oversubscribed with national rail services, it didn't need another. The ELL with a high frequency fast tube service would have been a better option for those of us north of the river than the dog slow service we ended up with. -- Spud |
#38
![]() |
|||
|
|||
![]()
In message , at 13:06:57
on Thu, 27 Nov 2014, David Cantrell remarked: Short platform lengths at some stations limit future lengthening. I don't understand this. Are people really too ****ing stupid to understand announcements like "passengers for Some Station must travel in the front four carriages"? Cos those work just fine elsewhere on the rail network. With ungangwayed 4-car units it's not always obvious which one you are in without getting out and having a look ... Hence all the "this is coach [pause] 5 [pause] of [pause] 8" announcements. None of the (splitting) trains I've been on have that sort of announcement. -- Roland Perry |
#39
![]() |
|||
|
|||
![]() |
#40
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message , at 13:06:57 on Thu, 27 Nov 2014, David Cantrell remarked: Short platform lengths at some stations limit future lengthening. I don't understand this. Are people really too ****ing stupid to understand announcements like "passengers for Some Station must travel in the front four carriages"? Cos those work just fine elsewhere on the rail network. With ungangwayed 4-car units it's not always obvious which one you are in without getting out and having a look ... Hence all the "this is coach [pause] 5 [pause] of [pause] 8" announcements. None of the (splitting) trains I've been on have that sort of announcement. A standard Southern message on I think all 377s not just those that split. (I forget if 455s have this as a screen message) -- Mark |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Doh - lack of Overground mentality | London Transport | |||
New years day service - or lack thereof | London Transport | |||
London Overground - lack of engineering works information | London Transport | |||
Lack of road markings in Kensington & Chelsea | London Transport | |||
Thameslink ticket checks - or lack of! | London Transport |