Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
At places such as Lewisham, the Central London "plough" system of
underground electrical pick-up gave way to the familiar "overhead" system. At that point "the plough" was disconnected, and went off into a siding; the overhead pick-up was hooked to the overhead cable, and the tram continued its journey. I only know this because my father-in-law told me - he used to watch it in Lewisham High Street - but there must be film of such an interesting changeover; I'd love to watch it for myself. Does anyone have a link. When I Google "tram" and "plough" this film comes up. Doesn't look too safe to me LOL: https://www.youtube.com/watch?v=rTjRUT98lvE |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Cross River Tram "top of Boris's list" | London Transport | |||
Tram equivalent of "Ian's Bus Stop" | London Transport | |||
removing staff? What happens to security? | London Transport | |||
HSE - "grossly inefficient" and "dysfunctional" | London Transport |