Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#12
![]() |
|||
|
|||
![]()
Clive D. W. Feather wrote:
In article , Bill Hayles writes Trains on the two main routes from Moorgate would have coupled at Highgate. ITYM "connected". Attempts at coupling would have been interesting, to say the least. No, coupled. Just like on the big railway. I think Bill is pointing out that the vertical difference between the two lines at Highgate make that a bit of a problem. If coupling was going to be performed it would most likely have been at Finchley Central as at East Finchley the lines join north of the platforms. -- Cheers for now, John from Harrow, Middx remove spamnocars to reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Streatham Hill to Tulse Hill peak hour passenger services | London Transport | |||
Mill Hill East | London Transport | |||
Victoria line extension to Herne Hill | London Transport | |||
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 | London Transport | |||
Mill Hill East | London Transport |