Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Mon, 11 Jan 2016 16:00:36 +0000
Steve Fitzgerald ] wrote: In message , e27002 aurora writes OTOH, there are serious Cons: The Hammersmith Branch would have to be re-electrified and probably re-signalled. At the very least track circuit immunization would have to change. One the S7 Stock Depots is at Hammersmith, that depot capacity would have to be provided elsewhere. Hammersmith is no longer a depot as such. It's just a stabling point. That seems a waste of a very large facility. Why? -- Spud |
#2
![]() |
|||
|
|||
![]() |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
By London's Northern Line to Battersea | London Transport | |||
Battersea Northern Line extension now done with a loan? | London Transport | |||
Northern Line to Battersea Power Station | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Northern line to battersea | London Transport |