Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On 2016\01\11 16:00, Steve Fitzgerald wrote:
In message , e27002 aurora writes OTOH, there are serious Cons: The Hammersmith Branch would have to be re-electrified and probably re-signalled. At the very least track circuit immunization would have to change. One the S7 Stock Depots is at Hammersmith, that depot capacity would have to be provided elsewhere. Hammersmith is no longer a depot as such. It's just a stabling point. We have to take trains from Ealing Common to Edgware Road for H&C services now. In service, I hope. Does "We" mean District drivers? i.e. The District drivers have to take the trains from the depot to Edgware Road, hand them over to Circle & Hammersmith drivers and then go back to Ealing on the cushions? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
By London's Northern Line to Battersea | London Transport | |||
Battersea Northern Line extension now done with a loan? | London Transport | |||
Northern Line to Battersea Power Station | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Northern line to battersea | London Transport |