Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Charles Ellson wrote:
On Thu, 14 Jan 2016 17:19:53 -0000 (UTC), Recliner wrote: Charles Ellson wrote: On Thu, 14 Jan 2016 16:22:51 -0000 (UTC), Recliner wrote: Charles Ellson wrote: On Thu, 14 Jan 2016 15:06:13 -0000 (UTC), Recliner wrote: e27002 aurora wrote: On Thu, 14 Jan 2016 13:44:18 +0000, Basil Jet wrote: On 2016\01\14 13:17, Recliner wrote: On Thu, 14 Jan 2016 13:08:41 +0000, e27002 aurora wrote: On Thu, 14 Jan 2016 00:14:35 +0000, Steve Fitzgerald ] wrote: In message , Anna Noyd-Dryver writes Hammersmith is no longer a depot as such. It's just a stabling point. We have to take trains from Ealing Common to Edgware Road for H&C services now. Thanks Steve, I've been meaning to come back to this post - apparently only 6 S7s stable at Hammersmith overnight now. Really? I didn't realise it was that few now as the other stabling points haven't changed much. Last time I was at HMD (for training) there were quite a few trains about and space for, I would guess maybe 20 to 25 in total. HMD was very much a C stock depot and once they went everything was focused at Ealing Common and Upminster (and a couple at Neasden) which both now provide H&C trains for service. So, Anna's point seems to have more, and more merit. Unfortunately it is too late now. The 14tph will remain as terminators. But at OOC when it opens, which will be more useful than Paddington. Yeah, but will OOC need 24tph? Would 12 not have been enough, with the other twelve (or fewer) going to Hammersmith? At one point there was talk of sending some Crossrail trains to Tring. That seems to have been quietly set aside. IMHO Sending some Crossrail trains to Tring and returning the Bakerloo to Watford would be excellent. Euston's main emphasis should be on InterCity travel. The Tring proposal seems to have receded because the Euston rebuilding for HS2 is now planned to be in phases, so platforms for the Tring services will remain available throughout. No-one is prepared to fund it given that the need has faded. With the Met headed for Watford Junction with a 6 tph service, there would be neither the space not the need for the Bakerloo to return there. According to one of the cunning plans circulated a couple of years ago it wouldn't have got past Wembley Central because the DC line would have been taken over by CrossRail. The only cunning plan for Crossrail that I've heard of on that route was for it to share the slow line to Tring, not take over the DC line. Everyone has known, seemingly forever, that the Met would be going to the Junction, and now it finally is, so what would Crossrail do at Watford? And how would Crossrail get to Wembley, if not on the slow line? A separate pair of tracks coming up the west side of the WCML. IIRC the displaced DC/Bakerloo terminating tracks were to be shoehorned into the "wasteland" south of the station. Why would it then switch to the DC line? To provide an extra pair of tracks for CR/WCML. I suspect the author had failed to look any further north when drawing on his/her fag packet. Another consequence to achieve the plan would probably have been clearing the entire site down to track level (as the walls supporting the Central Square raft would have been partly in the way) and extending westward of the Down DC to gain room for the extended platforms. Ah, I don't recall that 'plan'. It's almost Bellsian in its bonkersness! Ah-hah! Found it :- http://www.networkrail.co.uk/browse%...philip%201.pdf [http://tinyurl.com/gpe9jlt] It actually seems to be more than one cunning plan and still serving the DC line to Watford rather than how I remembered it but still with trains to/from London getting no further than Wembley. No wonder nothing has been heard of it since! |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
By London's Northern Line to Battersea | London Transport | |||
Battersea Northern Line extension now done with a loan? | London Transport | |||
Northern Line to Battersea Power Station | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Northern line to battersea | London Transport |