Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]() |
#3
![]() |
|||
|
|||
![]()
wrote:
In article 2016021618144730334-email@domaincom, (eastender) wrote: And it says so. http://anonw.com/2016/02/15/the-last...en-lengthened/ Reading the rest of the article, it's a pity they don't make use of the dual system capability to use overhead AC on the Euston approaches and simplify the layout there by chucking out the DC electrification when the changes ahead of HS2 are implemented. I was amazed to see they're keeping the dual voltage tracks through those changes. Yes, it is strange. Perhaps there isn't a suitable voltage change point on the Euston approach? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Last class 378 goes 5 car | London Transport | |||
The vocabulary of a Class 378 | London Transport | |||
Class 378/2 at Haggerston | London Transport | |||
Class 378 in service | London Transport | |||
New platform markings for class 378 at Shepherd's Bush | London Transport |