Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#14
![]() |
|||
|
|||
![]()
wrote in message ...
Why is it in this country - and elsewhere in europe it has to be said - that we really don't like building platforms that are level with the train floor? There's always a step up. This is understandable on curved platforms where the gap would be an issue, but on dead straight ones there is no excuse yet they're still lower. Only recently have we started building them level. Even the 1960s Victoria line tube suffers from platforms lower than the train floor other than on short sections where LU has raised them. At least in the UK we don't *usually* have to have a little set of steps on the platform by each door, or a mini-step ladder built into each doorway on the train; I saw plenty of instances of the latter on Michael Portillo's Great American Railroad Journeys programmes. You'd think it would be fairly obvious from the early days of railways: decide on a standard floor height above the tracks for all trains, and built all platforms at that height +/- a small tolerance to allow for the problem of curved platforms. Certainly putting platforms at rail level is never going to be right! Especially now rail companies need to cater for people in wheelchairs, who tended to get forgotten about in bygone days. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
LUL Ticket Office Staffing levels | London Transport | |||
Route 73 - New service levels | London Transport | |||
Shepherd's Bush on the Central Line - another platform? | London Transport | |||
Picc Line - Please mind the gap between the train and the platform | London Transport | |||
No platform adverts at St Paul's | London Transport |