Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#6
![]() |
|||
|
|||
![]()
On 25/09/2016 16:56, Recliner wrote:
The Commission's report did also include under Safety considerations: "12.24 The CAA did note the lack of precedent for the Heathrow Extended Northern Runway concept and indicated that it would need more detailed development. It was emphasised, however, that the CAA remained open-minded on the concept and open to further engagement." And even Heathrow Hub's own press release on their safety study had: "Hazards arising during normal operations and emergency situations, including go-arounds and overruns, were examined using a combination of quantitative and qualitative techniques. The initial assessment concluded that the proposed Heathrow Hub concept has the potential to be safe, but that further analysis and evidence would be required to prove this in detail." I'm not qualified to judge the risks of "tandem" runways. But I do know one economist said it'd be really, really hard to assess the cost if a go-around or overrun allowed Heathrow to beat Tenerife's record of 583 ![]() -- Robin reply-to address is (intended to be) valid |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
London Hub proposal published by Halcrow/Foster+Partners | London Transport | |||
Sir Terry Farrell backs Euston as venue for London high speedrail hub | London Transport | |||
Heathrow (rail) Hub | London Transport | |||
How the financial crisis, becoming the biggest winner | London Transport | |||
South West franchise winner to accept Oyster pay-as-you-go | London Transport News |