Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Opening tomorrow (Saturday).
The re-building was due to take 18 months. I don''t know if that is how long it has actually taken, because I can't remember when it closed. Why did it take so long to re-build such a small structure? There seemed to be a long gap between the demolition of the old station and the construction of the new one, but a long closure was planned. |
#2
![]() |
|||
|
|||
![]() Quote:
|
#3
![]() |
|||
|
|||
![]() On 08/10/2016 10:42, Robin9 wrote: ;158600 Wrote: Opening tomorrow (Saturday). The re-building was due to take 18 months. I don''t know if that is how long it has actually taken, because I can't remember when it closed. Why did it take so long to re-build such a small structure? There seemed to be a long gap between the demolition of the old station and the construction of the new one, but a long closure was planned. Is it a TfL project? If it is, there's your answer. Idiotic non-answer. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
West Croydon new down-side entrance | London Transport | |||
New Cross gate to West Croydon/Crystal Palace | London Transport | |||
Idle West Croydon query | London Transport | |||
New North West quadrant bus map available in Harrow Bus Station | London Transport |