Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#17
![]() |
|||
|
|||
![]()
In message , at 12:20:03 on Wed, 12 Oct
2016, Basil Jet remarked: Just curious - does anyone know what form the architecture will take, will it be like the JLE, crossrail or something completely new? Also I presume the 2 new stations will have platform doors too which I imagine will mean some new kit on the trains - unless its already installed. Just a thought... one of the Northern platforms at London Bridge is as new as the Jubilee extension but doesn't have PEDs. Although perhaps that is because the existing tunnels could be used for ventilation, so adding PEDs would not have saved anything. The ventilation there is partly via the old C&SLR tunnels, but also the original lift shaft. I've always wondered if that has survived the recent large amount of rebuilding at ground level (it's outside the footprint of the NR station). -- Roland Perry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Battersea extension | London Transport | |||
Battersea Northern Line extension now done with a loan? | London Transport | |||
Battersea extension up in smoke? | London Transport | |||
Northern Line Extension To Battersea | London Transport | |||
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 | London Transport |