Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#2
![]() |
|||
|
|||
![]()
wrote:
In article -septembe r.org, (Recliner) wrote: Charles Ellson wrote: On Thu, 9 Feb 2017 09:29:09 +0000 (UTC), d wrote: On Thu, 9 Feb 2017 07:48:39 +0000 Basil Jet wrote: Does anyone know when Barbican ceased to be served by Thameslink trains FROM Moorgate? All of the web resources suggest that Barbican was served by Thameslink trains in both directions until 2009, but I know that platform 4 was out of use for at least a decade before the junction at Farringdon closed. Sounds reasonable. I used to use the circle line about 15 years ago and P4 was out of use even then. On a related note, does anyone know the fate of that branch? Are LU still going to take it over and use it for sidings when crossrail is done, or has that fallen by the wayside? Some has been built over, some is used for storage and ISTR might be used for additional sidings. Seen on Twitter today -- new LU sidings being built at Farringdon: Track renewals at Farringdon - first phase installation of a new modular double junction and sidings roads https://pbs.twimg.com/media/C4YhuGaWIAA6BE9?format=jpg&name=large Replacing earlier sidings which were taken up because they were too short, surely? Yes, I think so. Presumably there's now room for longer ones, with the WL tracks gone. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Barbican Thameslink service | London Transport | |||
Barbican Thameslink service | London Transport | |||
Barbican Thameslink service | London Transport | |||
Barbican station closure? | London Transport | |||
Official vandalism at Barbican | London Transport |