On Wednesday, August 9, 2017 at 7:41:10 PM UTC+1, Basil Jet wrote:
On 2017\08\09 17:17, Paul Corfield wrote:

I know what the report says. TfL have had plans for extra peak hours trains between Seven Sisters and Enfield Town to try to resolve the high demand on that flow because of the large scale of interchange. Obviously Liverpool St trains are still busy and pick up many more people further south. I have seen no suggestion at all that the current 4 tph peak / 2 tph off peak Enfied - Liv St service would be diverted anywhere.

The extras can't run to LST as there aren't the paths nor any effective intermediate turnbacks. This leaves only a couple of options as to what you do with the trains once they reached Seven Sisters. You either try to reverse on the chord or you run through South Tottenham and reverse them there or on the connecting tracks towards Stratford / Clapton or you send them eastwards on the GOBLIN. Given the GOBLIN is forecast in the future to have continued levels of overcrowding, even with longer electric trains, between Barking and Blackhorse Road I can see the attraction to TfL of trying to add some extra peak frequency on this section. Anyway this is all a fair number of years away given funding constraints. I only mentioned it in the first place as an interesting snippet from the report.


Another option is to send the extras from Enfield to Stratford.


Out of the frying pan and into the fire! They'd impede the flow
of traffic to and from Tottenham Hale which, we're always told,
is so intense that additional tracks are required.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
A foot and cycle bridge across Barking Creek as part of the DLRDagenham Dock extension? Tom Anderson London Transport 16 December 5th 08 05:52 PM
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 Martin Whelton London Transport 43 May 27th 04 08:40 AM
Crossrail funding approved Matthew Malthouse London Transport 25 July 27th 03 12:02 PM


All times are GMT. The time now is 07:37 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017