Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]() |
#2
![]() |
|||
|
|||
![]()
On Mon, 19 Feb 2018 13:26:46 +0000, Basil Jet
wrote: https://www.ianvisits.co.uk/blog/201...ation-upgrade/ Thanks for posting that. I hope this time, the scheme does go through. Ironically, I think both the Picc platforms had step-free access in their original 1906 version, before the 1970s escalators replaced the old lifts. And the sub-surface lines had a total of six platforms until 1957. So the mid/late 20th century 'improvements' in some ways made the station worse, with less capacity. |
#4
![]() |
|||
|
|||
![]()
wrote:
In article , (Recliner) wrote: On Mon, 19 Feb 2018 13:26:46 +0000, Basil Jet wrote: https://www.ianvisits.co.uk/blog/201...-south-kensing ton-tube-station-upgrade/ Thanks for posting that. I hope this time, the scheme does go through. Ironically, I think both the Picc platforms had step-free access in their original 1906 version, before the 1970s escalators replaced the old lifts. And the sub-surface lines had a total of six platforms until 1957. So the mid/late 20th century 'improvements' in some ways made the station worse, with less capacity. The 6 surface lines platforms included 2 bays whose regular passenger use ceased some time before 1957. I remember the south side east-facing bay only being used to stable a train on Sundays when I was a child. That was before the escalator shaft was built through the platform serving that bay and the westbound District line too. So that's 2 platforms that can't be restored. The Metropolitan west-facing bay is where the stairs to the Piccadilly access were built UIVMM, so only the north originally Metropolitan platform can be restored to use. The article wasn't crystal clear but I guess the plan is for all eastbound trains to use it with the island only using its south face in future. Yes, that's how I read it, too. That does make me wonder how interchange with the Piccadilly Line will be arranged to the new platform. I assume the current underground link corridor would be extended north, with new stairs to the widened, restored northern platform. So the route from the Picc would first pass the stairs to the now westbound-only District platform, and then the new stairs to the restored eastbound platform. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Completion of London's Thameslink rail project delayed untilDecember 2019 | London Transport | |||
London Bridge platforms 14-15 reopen | London Transport | |||
Hammersmith Flyover to reopen to light traffic - BBC News | London Transport | |||
Claphan Junction Disused platform 1 | London Transport | |||
ROLL (Reopen Lea Valley Line) meeting | London Transport |