Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On Mon, 21 May 2018 13:44:10 +0100
Recliner wrote: On Mon, 21 May 2018 12:38:12 +0000 (UTC), wrote: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Surely that just requires laying some conductor rail? Plus there's nothing happening at Barbican, the line is still blocked with a partition wall at the west end of the station. |
#12
![]() |
|||
|
|||
![]()
wrote:
On Mon, 21 May 2018 13:44:10 +0100 Recliner wrote: On Mon, 21 May 2018 12:38:12 +0000 (UTC), wrote: I was on the Met line platforms at moorgate for the first time in about 5 years today. The entire old Thameslink platform has been partitioned off. Is this to do with crossrail or is something else going on in there? Turning the old CWL into LU sidings. Surely that just requires laying some conductor rail? Plus there's nothing happening at Barbican, the line is still blocked with a partition wall at the west end of the station. At the very least, several new crossovers and signals are needed. |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
St Pancras temporary platforms - whats their future? | London Transport | |||
Brixton - whats happening? | London Transport | |||
Whats happened to strike threat? | London Transport | |||
Whats the quickest way.... | London Transport | |||
Whats up with charging £5.10 for an off-peak travel card? | London Transport |