London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old June 22nd 18, 09:24 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default What went wrong with the new Thameslink timetable

A sorry tale with many deserving of blame, and no heroes:

https://www.londonreconnections.com/2018/holy-grails-and-thameslink-fails-part-2-the-plan-that-went-wrong/

One thing I hadn't appreciated was how much of the plan depended on GBRf
drivers, because GTR didn't have enough.
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Thameslink / Southeastern timetable consultation Basil Jet[_4_] London Transport 1 September 20th 16 10:07 PM
District Line tonight - what went wrong? [email protected] London Transport 0 February 19th 09 10:00 PM
Christmas/New Year Service Info + Grand Central starts operating at the beginning of Dec-June timetable [email protected] London Transport 4 November 11th 06 10:06 AM
Tube timetable New Years Eve/Day Ryan London Transport 6 October 15th 04 07:24 PM
Query on new SWR timetable Michael R N Dolbear London Transport 1 September 29th 03 09:30 PM


All times are GMT. The time now is 06:42 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017