Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Dominic wrote:
(Chris Rogers) wrote in message . com... (Dominic) wrote in message . com... In the case of Voyagers, you would expect that any formation of 2 or more cars would be possible as each car has its own engine - in fact because of distributed systems and other technical limitations, the minimum consist of a unit is 4 cars. That's interesting. I didn't know this inflexibility applied to Voyagers. I thought distributed systems were less common on DMUs. Maybe it's because of their 3-phase electric transmission? Modern MU's have many systems that if placed in close proximity to each other can affect performance, ie it is not a good idea to put OTMR computers close to other stuff pumping out high levels of electrical energy. The systems are distributed along the train in the same way that the drive, be it hydraulic or electric is. Cross feeding between cars is possible so that if one engine cuts out the coach is powered from the others for ETS/HVAC purposes. It actually is not that inflexible. Modern depots lifting equipment capable of lifting 5-10 cars at the same time. By treating it as a unit and not a set of vehicles maintenance is easier to plan. The TMS systems in operation are only really effective over a maximum of 5 cars, so when coupling two sets the TMS on both must be able to talk to the other one and gain information on all the systems by way of data transfer, with this, the cross feeding etc, a lot of cables run between the vehicles. The TMS is usually in one of the outer vehicles behind the cab. Couple two with the TMS at opposite ends to each other and there can be a few seconds delay whilst the messages between computers match up and talk to each other. In the early days of Voyagers 175s, and 180s drivers and crews would be seen pushing buttons repeatedly after 5-6 seconds thereby starting the system diagnostic over and over again. Mods to reduce the complexity and display only the information the driver needs to see have reduced this problem considerably. To test the viability of the TMS several very long MU test trains have been run with up to 4 TMS's all communicating along 20 vehicles. It worked. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
"Delivering a Modern European Railway for 21st Century Ireland" -with Dick Fearn 15th October 19 00 hours | London Transport | |||
Modern Railways, June | London Transport | |||
The modern art fountain thing at St Giles Circus | London Transport | |||
Modern Railways, June | London Transport | |||
Modern trains and electronic equipment? | London Transport |