Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Does anybody know when Metronet or Tube Lines is FINALLY going to
certify Wembley Park Depot as safe for train storage and maintenance? IIRC it's been sitting empty for several months after it had its asbestos removed. Brad |
#2
![]() |
|||
|
|||
![]() "TheOneKEA" wrote in message om... Does anybody know when Metronet or Tube Lines is FINALLY going to certify Wembley Park Depot as safe for train storage and maintenance? IIRC it's been sitting empty for several months after it had its asbestos removed. Several months? Over three years, you mean! |
#3
![]() |
|||
|
|||
![]()
TheOneKEA wrote:
Does anybody know when Metronet or Tube Lines is FINALLY going to certify Wembley Park Depot as safe for train storage and maintenance? IIRC it's been sitting empty for several months after it had its asbestos removed. Brad I thought it was the state of the glass roof, not as asbestos. I stand to be corrected. -- Lawrence Myers |
#4
![]() |
|||
|
|||
![]() "Lawrence Myers" wrote in message news ![]() I thought it was the state of the glass roof, not as asbestos. I stand to be corrected. It was originally asbestos sheeting, which was removed as part of the overhaul of the shed four years ago (along with a lot of other work). The refurbished shed, with the new roof, has been standing empty since completeion of the overhaul. There have been earlier threads on the same subject, to which a couple of 'insiders' at LUL had posted the reasons for the delay in recommissioning the shed. Unfortunately I can't remember what they were now! Apologies. |
#5
![]() |
|||
|
|||
![]()
Looks like it could be alot longer now as platform 6 has some fencing on it
(restricting its use) I guess this to be part of the re-modernisation works for the station (along with the new Wembley Stadium or whatever its gonna be called) |
#6
![]() |
|||
|
|||
![]()
"Roger the cabin boy" wrote in message ...
Looks like it could be alot longer now as platform 6 has some fencing on it (restricting its use) I guess this to be part of the re-modernisation works for the station (along with the new Wembley Stadium or whatever its gonna be called) I believe it is - the Met timetable has been modified now to have all southbound trains stop at Wembley Park in the off-peak on the south slow platform. I traveled through Wembley Park last Saturday from Amersham and my train stopped there, after trundling through Northwick Park and Preston Road. I had no idea that the depot was out of use for so long... Brad |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Wembley Park sidings - again | London Transport | |||
Trains don't stop at Wembley Park...or do they? | London Transport | |||
New Chiltern depot in Wembley | London Transport | |||
Wembley Park engineering 22/23 May | London Transport | |||
Detraining at Wembley Park | London Transport |