Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
On Thu, 13 May 2004 19:28:37 +0100 Paul Corfield
said... There is a mini fares revision on 23 May 2004 to coincide with the new NR Timetable. the changes include the introduction of the LUL fare scale for - the North London Line between North Woolwich and Richmond - West London line between Willesden Junction and West Brompton - Thameslink between West Hampstead and Kentish Town (LU fares already apply south of Kentish Town to E&C / London Bridge / Moorgate) This will mean a reduction in fares for many trips - especially via the NLL. Also through fares to Southern Railway destinations (i.e South Central) from LUL will be changed to reflect a new zonal structure being introduced. I have no more detail that this but it sounds intriguing. No word on whether Pre-Pay also becomes valid. However the changes are in line with TfL's published proposals to extend the LUL fare scale and Pre-Pay. Sounds one step closer to the creation of a proper rail authority for London: http://www.transportforlondon.gov.uk...004/may/press- 1020a.shtml -- Phil Richards London, N4 |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
London Fares and Product Changes from 2nd January 2005 (LONG) | London Transport | |||
London Fares and Product Changes from 2nd January 2005 (LONG) | London Transport | |||
London Fares and Product Changes from 2nd January 2005 (LONG) | London Transport | |||
Interesting changes to NR Fares | London Transport | |||
Interesting changes to NR Fares | London Transport |