Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.

Likwise does any news exist on the Heathrow Express extension.

Martin
  #2   Report Post  
Old May 17th 04, 09:38 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 627
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

In message , Martin
Whelton writes
Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.

Plans are advanced for the closure of the T4 loop to allow the T5
extension to be connected. I think the latest plan is around December.
I'll try and confirm today at work, but I think we're looking at about a
two year closure.
--
Steve Fitzgerald has now left the building.
You will find him in London's Docklands, E16, UK
(please use the reply to address for email)
  #3   Report Post  
Old May 17th 04, 03:35 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

Steve Fitzgerald ] wrote in message ...
In message , Martin
Whelton writes
Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.


Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?

B2003
  #4   Report Post  
Old May 17th 04, 03:39 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

Steve Fitzgerald ] wrote in message ...
In message , Martin
Whelton writes
Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.


Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?

B2003
  #5   Report Post  
Old May 17th 04, 09:31 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 627
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

In message , Boltar
writes

Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?


Absolutely no idea, we've not been given that detail.
--
Steve Fitzgerald has now left the building.
You will find him in London's Docklands, E16, UK
(please use the reply to address for email)


  #6   Report Post  
Old May 19th 04, 12:42 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 94
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5


"Steve Fitzgerald" ] wrote in message
...
In message , Boltar
writes

Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?


Absolutely no idea, we've not been given that detail.



Has there been a consensus regarding how it will be rendered on the map yet?

If one loop goes HX-T4-T123-HX and the other goes HX-T123-T5-HX, then the
diagram will need to resemble a pair of testicles at the end of the line,
no?

BTN


  #7   Report Post  
Old May 19th 04, 12:44 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 125
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5


"Ben Nunn" wrote in message
...

"Steve Fitzgerald" ] wrote in message
...
In message , Boltar
writes

Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?


Absolutely no idea, we've not been given that detail.



Has there been a consensus regarding how it will be rendered on the map

yet?

If one loop goes HX-T4-T123-HX and the other goes HX-T123-T5-HX, then the
diagram will need to resemble a pair of testicles at the end of the line,
no?


T5 will not be on a loop. Some trains will go HX-T4-T123-HX as now and the
others will go HX-T123-T5(reverse)-T123-HX

Peter Smyth


  #8   Report Post  
Old May 19th 04, 09:34 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 18
Default Piccadilly line extension to Terminal 5/Heathrow Expressextension to T5

Once upon a time -- around about 5/19/04 08:42 --
possibly wrote:

diagram will need to resemble a pair of testicles at the end of the line,
no?

I will thank you not to do that again. I laughed so hard I got water all
over my keyboard. I'm very cross with you right now.

-- E

--
Frodo Baggins' New Year's Resolution "To ditch the bloody ring. And get
laid." (A London Times article by James Morgan 12-31-02)

  #9   Report Post  
Old May 17th 04, 09:54 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default Piccadilly line extension to Terminal 5/Heathrow Express extensionto T5

Boltar wrote:
Steve Fitzgerald ] wrote in message ...

In message , Martin
Whelton writes

Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.



Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?

B2003


I doubt there will be PEDs as Jubilee drivers had to receive special
training for theirs - there's not much point having to train all
Piccadilly drivers to do this for just one station. There may be some
technical issues too but I'm not sure about those.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London
  #10   Report Post  
Old May 23rd 04, 10:46 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 52
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

In article ,
Steve Fitzgerald ] wrote:
In message , Martin
Whelton writes
Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.


Plans are advanced for the closure of the T4 loop to allow the T5
extension to be connected. I think the latest plan is around December.
I'll try and confirm today at work, but I think we're looking at about a
two year closure.


The latest edition of Rail implies that the the first Picadilly line
tunnel between T123 and T5 is already complete and the second tunnel is
about to start. Both Picadilly line and HEX will have twin track
connections to T5 with two platforms at T5 for each service and an option
of two further platforms for HEX. There is also an implication (it is not
entirely clear in the article) that HEX trains will serve T123 and T5
only. The plan to split HEX trains at T123 into T4 and T5 portions seems
to have been abandoned. Also the new Paddington-Heathrow stopping service
"Heathrow Connect" will turn round at T123 when it starts next year (ie it
will not serve T4). It will eventually be extended to T5. So it looks like
T4 will not be seeing many trains !

David



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Heathrow to dover cruise terminal [email protected] London Transport 11 July 27th 07 11:02 PM
South Kensington to Heathrow Terminal 3 on Tuesday David of Broadway London Transport 29 October 29th 06 03:08 PM
Heathrow's Terminal " to be demolished Anon London Transport 0 November 13th 05 07:01 PM
Walking from Heathrow Terminal 4 Mark London Transport 3 June 26th 04 09:34 PM
Stansted Express Train - Express ride to a missed flight Mike Delorme London Transport 8 February 28th 04 05:42 PM


All times are GMT. The time now is 03:06 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017