Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to be finished by next year. I also understand that Terminal 4 would be temporaily closed during the construction period. Likwise does any news exist on the Heathrow Express extension. Martin |
#2
![]() |
|||
|
|||
![]()
In message , Martin
Whelton writes Do we know when construction work is due to start on the Piccadilly extension to Terminal 5 as I understand that tunneling work was due to be finished by next year. I also understand that Terminal 4 would be temporaily closed during the construction period. Tunnelling is well under way and I believe the station box is all but finished. Plans are advanced for the closure of the T4 loop to allow the T5 extension to be connected. I think the latest plan is around December. I'll try and confirm today at work, but I think we're looking at about a two year closure. -- Steve Fitzgerald has now left the building. You will find him in London's Docklands, E16, UK (please use the reply to address for email) |
#3
![]() |
|||
|
|||
![]()
Steve Fitzgerald ] wrote in message ...
In message , Martin Whelton writes Do we know when construction work is due to start on the Piccadilly extension to Terminal 5 as I understand that tunneling work was due to be finished by next year. I also understand that Terminal 4 would be temporaily closed during the construction period. Tunnelling is well under way and I believe the station box is all but finished. Will the station be in the JLE style with platform doors or will it be like T123 & Hatton Cross? B2003 |
#4
![]() |
|||
|
|||
![]()
Steve Fitzgerald ] wrote in message ...
In message , Martin Whelton writes Do we know when construction work is due to start on the Piccadilly extension to Terminal 5 as I understand that tunneling work was due to be finished by next year. I also understand that Terminal 4 would be temporaily closed during the construction period. Tunnelling is well under way and I believe the station box is all but finished. Will the station be in the JLE style with platform doors or will it be like T123 & Hatton Cross? B2003 |
#5
![]() |
|||
|
|||
![]()
In message , Boltar
writes Will the station be in the JLE style with platform doors or will it be like T123 & Hatton Cross? Absolutely no idea, we've not been given that detail. -- Steve Fitzgerald has now left the building. You will find him in London's Docklands, E16, UK (please use the reply to address for email) |
#6
![]() |
|||
|
|||
![]() "Steve Fitzgerald" ] wrote in message ... In message , Boltar writes Will the station be in the JLE style with platform doors or will it be like T123 & Hatton Cross? Absolutely no idea, we've not been given that detail. Has there been a consensus regarding how it will be rendered on the map yet? If one loop goes HX-T4-T123-HX and the other goes HX-T123-T5-HX, then the diagram will need to resemble a pair of testicles at the end of the line, no? BTN |
#7
![]() |
|||
|
|||
![]() "Ben Nunn" wrote in message ... "Steve Fitzgerald" ] wrote in message ... In message , Boltar writes Will the station be in the JLE style with platform doors or will it be like T123 & Hatton Cross? Absolutely no idea, we've not been given that detail. Has there been a consensus regarding how it will be rendered on the map yet? If one loop goes HX-T4-T123-HX and the other goes HX-T123-T5-HX, then the diagram will need to resemble a pair of testicles at the end of the line, no? T5 will not be on a loop. Some trains will go HX-T4-T123-HX as now and the others will go HX-T123-T5(reverse)-T123-HX Peter Smyth |
#8
![]() |
|||
|
|||
![]()
Once upon a time -- around about 5/19/04 08:42 --
possibly wrote: diagram will need to resemble a pair of testicles at the end of the line, no? I will thank you not to do that again. I laughed so hard I got water all over my keyboard. I'm very cross with you right now. -- E -- Frodo Baggins' New Year's Resolution "To ditch the bloody ring. And get laid." (A London Times article by James Morgan 12-31-02) |
#9
![]() |
|||
|
|||
![]()
Boltar wrote:
Steve Fitzgerald ] wrote in message ... In message , Martin Whelton writes Do we know when construction work is due to start on the Piccadilly extension to Terminal 5 as I understand that tunneling work was due to be finished by next year. I also understand that Terminal 4 would be temporaily closed during the construction period. Tunnelling is well under way and I believe the station box is all but finished. Will the station be in the JLE style with platform doors or will it be like T123 & Hatton Cross? B2003 I doubt there will be PEDs as Jubilee drivers had to receive special training for theirs - there's not much point having to train all Piccadilly drivers to do this for just one station. There may be some technical issues too but I'm not sure about those. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
#10
![]() |
|||
|
|||
![]()
In article ,
Steve Fitzgerald ] wrote: In message , Martin Whelton writes Do we know when construction work is due to start on the Piccadilly extension to Terminal 5 as I understand that tunneling work was due to be finished by next year. I also understand that Terminal 4 would be temporaily closed during the construction period. Tunnelling is well under way and I believe the station box is all but finished. Plans are advanced for the closure of the T4 loop to allow the T5 extension to be connected. I think the latest plan is around December. I'll try and confirm today at work, but I think we're looking at about a two year closure. The latest edition of Rail implies that the the first Picadilly line tunnel between T123 and T5 is already complete and the second tunnel is about to start. Both Picadilly line and HEX will have twin track connections to T5 with two platforms at T5 for each service and an option of two further platforms for HEX. There is also an implication (it is not entirely clear in the article) that HEX trains will serve T123 and T5 only. The plan to split HEX trains at T123 into T4 and T5 portions seems to have been abandoned. Also the new Paddington-Heathrow stopping service "Heathrow Connect" will turn round at T123 when it starts next year (ie it will not serve T4). It will eventually be extended to T5. So it looks like T4 will not be seeing many trains ! David |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Heathrow to dover cruise terminal | London Transport | |||
South Kensington to Heathrow Terminal 3 on Tuesday | London Transport | |||
Heathrow's Terminal " to be demolished | London Transport | |||
Walking from Heathrow Terminal 4 | London Transport | |||
Stansted Express Train - Express ride to a missed flight | London Transport |