Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On 11/04/2021 15:29, Anna Noyd-Dryver wrote:
Graeme Wall wrote: On 11/04/2021 14:00, Anna Noyd-Dryver wrote: Recliner wrote: Graeme Wall wrote: On 11/04/2021 12:28, Recliner wrote: Marland wrote: wrote: On Sat, 10 Apr 2021 15:41:53 -0000 (UTC) Recliner wrote: wrote: That matters for long distance lorries and buses for whom suitable batteries would be a ridiculous size, but for cars its not even an issue right now, never mind as technology advances. Yes, they're maybe half a ton heavier than an equivalent ICE car at most, but the vehicle size is the same, if not a bit smaller. Which is why H2 is mainly being considered for larger, heavier vehicles: trains, trucks, long distance buses, large SUVs, perhaps even short range airliners. It's not needed nor viable for ordinary cars. Hummer have already built 2 large battery SUVs. And H2 trains makes no bloody sense whatsoever - just electric the damn lines and if its too expensive for overhead then they should recind that moronic rule about no more 3rd rail and lay that instead. Don’t know about that but now that having multi system trains is easier now than it once was then I wonder if electrification at 25,0000 volt and all the clearance work that has to be done thus raising costs is always the best solution. If you are not building for high speed or heavy loads then 1500 or 3000 DC may suffice for short parts of the network. The tram train concept in Yorkshire shows the electrical side is achievable. Just surmising but if 25.000 ever gets to Penzance would you really need it to Barnstaple , Okehampton Looe, Falmouth etc if using stock that could use 1500 DC with trolley wire electrification and no need to rebuild bridges would save costs even though you may need a few more substations. OTOH presumably it is easier to hook a DC substation into the existing electricity supply network as the rectifiers connected to all 3 phases don’t unbalance it in the way single phase 25,000 can without careful planning. The current bright idea is discontinuous electrifcation. Trains/trams are fitted with short range batteries so the difficult/scenic bits don't need OHL. The first UK example is the Birmingham Metro extension. Hitachi is offering class 800 variants with traction batteries rather than big diesel engines so they will be able to run for a few miles without OHL. That will save the cost of rebuilding low bridges or disfiguring historic areas. It could also save money by bridging the non-electrified islands or branches in otherwise electrified networks, such as the Uckfield or Marshlink lines. The proposal is to retrofit batteries to some third rail Electrostar units. I wonder if that would work on the North Downs Line? I suspect the section from Shalford to Redhill is probably too long for battery working. Isn't that much shorter than the Marshlink line? It's around 18 miles. There's another 11 miles non-electrified from Wokingham to Ash. Ta, I was assuming the Wokingham-Ash section was within the capabilities of a battery unit. Though as they're only separated by around 5.5miles, you need to consider the effect that one will have on the other (or effectively consider it as one, 29-mile, section). That is the imponderable, would there be enough time between Ash and Shalford to recharge the batteries sufficiently. -- Graeme Wall This account not read. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Stations named after commercial entities | London Transport | |||
Stations named after commercial entities | London Transport | |||
Harrow and Wealdstone named London rail station of the year | London Transport | |||
Kings Cross fire (1987) : final victim named | London Transport | |||
1987 King's Cross fire victim named | London Transport |