London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #9   Report Post  
Old June 24th 04, 04:31 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2003
Posts: 63
Default Kings Cross mainline - query

Roland Perry wrote:

I came across a Railtrack-era brochure a few weeks ago that listed all
kinds of exciting upcoming improvements over the whole length of the
ECML. I'm sure that a new "Platform 0" at KX was one of them. As far as
I can tell, none of them has happened (the first phase should have been
completed by now).
--
Roland Perry


What do you mean?

Haven't they upgraded a power supply near Stevenage AND they've just
started on the 'Allington' chord line N of Grantham. (you can see the
site huts being installed from line to Nottingham) You can't describe
that as 'Nothing'?

Jim Chisholm
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Paddington mainline gates & Kings Cross validators Matthew Dickinson London Transport 11 May 29th 09 01:09 AM
New Cross Gate Query Paul Scott London Transport 23 June 5th 08 12:10 AM
Kings Cross NXEC ticket machines and cross London tickets Matthew Dickinson London Transport 2 February 15th 08 08:46 PM
Kings Cross development proposals and Cross River Tram Link Bob London Transport 0 December 19th 05 09:47 AM
UK Kings Cross mainline query Nigel J. Rollings London Transport 1 June 27th 04 05:53 PM


All times are GMT. The time now is 04:02 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017