London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #7   Report Post  
Old July 17th 04, 05:16 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2004
Posts: 14
Default Chiltern platform extensions

On Fri, 16 Jul 2004 19:35:19 +0100, Dave Arquati
wrote:

Chiltern are extending platforms at Princes Risborough, High Wycombe,
Beaconsfield, Gerrard Cross and Wembley Stadium starting this week at
Princes Risborough.

At Gerrards Cross that will be the Up platform. When the station was
remodelled in the 1980s a new Up platform was built on the formation
of the old Up through line. The old Up platform was 8 car's length
and more, and was often used by 2 x 4-car 115 sets. Then BR moved
some Driving Trailer Composites from the Lake District area (105s?)
and made up 2-car sets with a 115 Driving Motor Standard, and that was
the end of 8 car trains, even in rush hour. So the new platform, with
the usual short-sighted vision of BR was made just long enough for the
6 car sets.
Another poster has referred to the Tesco development which has been
on-going for several months now. For those who have not spotted this
development, and I have seen not a mention of it in MR, a tunnel is
being created in the deep cutting at GX so that a Tesco (totally
unwanted by GX residents) can be built on top. There were many delays
in starting the project, some caused by a re-design to make the tunnel
4 track width, just in case Central Railway comes this way! If it
does, all the remodelling of the station in the 1980s will have to
undone including the new platform extension.
The tunnel development is an interesting piece of civil engineering on
quite a considerable scale, including the creation of a new siding for
stone trains (extension of a turn-back siding used by Chiltern) and a
conveyor belt to shift the scantlings.
I have a lot of photos of the work and might put them up on a web
site, but I am no expert in that technology, so it won't be an all
singing and dancing affair..

Guy Gorton
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Southern Metro platform extensions (was TfL grant LOROL 2 year extension) David Cantrell London Transport 24 March 12th 13 09:54 AM
oyster season extensions spammy London Transport 3 January 21st 04 12:25 AM
Ticket extensions The Only Living Boy in New Cross London Transport 0 November 24th 03 06:30 PM
East London Line Extensions Dave Arquati London Transport 25 November 23rd 03 09:43 PM
Zone extensions with Oyster? Nick Cooper 625 London Transport 41 October 13th 03 09:31 AM


All times are GMT. The time now is 08:18 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017