Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Thread restarted because original reply failed to go.
"Richard J." wrote in message ... Terry Harper wrote: Somewhere I have a brochure produced in 1938-9 to promote industrial estates in the Forest of Dean and Chepstow area, and that shows a dual carriageway road tunnel under the Severn, running almost on the alignment of the now A49 and the first Severn Road Crossing. The A49 route is Ross-on-Wye/Hereford/Shrewsbury/Warrington/Preston (nearly). I assume you mean almost on the alignment of the original M4 Severn Bridge, now M48. Sorry, yes I did. Should have checked first. -- Terry Harper, Web Co-ordinator, The Omnibus Society 75th Anniversary 2004, see http://www.omnibussoc.org/75th.htm E-mail: URL: http://www.terry.harper.btinternet.co.uk/ |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
have the time to do everything you want | London Transport | |||
traffic is better, but livingstone is thinking of more traffic zone? | London Transport | |||
Everything we know about traffic-calming is wrong | London Transport | |||
Traffic Calming in Islington | London Transport | |||
top up wrong Oyster (almost) | London Transport |