Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#51
![]() |
|||
|
|||
![]()
On Wed, 25 Aug 2004 16:55:53 +0100, Iain Bowen
wrote: In article , says... "David Hansen" wrote in message ... Unless one has double-deck platforms, loading and unloading such trains will always be a slow operation given the way such trains have to be laid out. The French seem to manage! So do the Dutch. As do the Swiis. Double-deck Inter City trains, no less. -- Regards Mike mikedotroebuckatgmxdotnet |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport |