London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #51   Report Post  
Old September 1st 04, 04:54 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Aug 2004
Posts: 30
Default Crossrail.

On Wed, 25 Aug 2004 16:55:53 +0100, Iain Bowen
wrote:

In article ,
says...

"David Hansen" wrote in message
...
Unless one has double-deck platforms, loading and unloading such
trains will always be a slow operation given the way such trains
have to be laid out.


The French seem to manage!


So do the Dutch.


As do the Swiis. Double-deck Inter City trains, no less.


--
Regards

Mike

mikedotroebuckatgmxdotnet

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 07:13 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) Aidan Stanger London Transport 3 August 12th 04 07:12 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) [email protected] London Transport 3 August 9th 04 04:06 PM


All times are GMT. The time now is 07:10 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017