Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
I was reading a book by Brian Hardy about the tube trains on the Isle of
Wight and he states that the LUL track gauge is 4 foot 8.75 inches but the BR gauge is 4 ft 8.5 and that this caused issues initially. Is this a true statement (perhaps he was misinformed?) as it seems amazing to me and if it is does it cause any operational issues on shared tracks such as on the Bakerloo and Met? B2003 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Track Charts or Track maps of the London Underground | London Transport | |||
DLR track gauge | London Transport | |||
Christmas Won`t Be The Same Again!!! | London Transport | |||
More expensive for same journey? | London Transport | |||
Unions to decide safety inspections on LUL track? | London Transport |