Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#9
![]() |
|||
|
|||
![]() "Graeme Wall" wrote in message ... Good point - especially valid if they run the Eurostars in pairs, one to Brussels and one to Paris. They already do, the two services depart Waterloo 5 minutes apart, all to do with paths through the Channel Tunnel. IIRC one Eurostar requires two shuttle paths but a 'flight' of two Eurostars only requires 3 paths, thus saving a path that Eurotunnel can use either for shuttles or freight. This obviously has the same effect on the CTRL: 2 fast trains close together, then the next two 25 minutes later, should be fairly easy to flight the slower trains in the resulting gaps. They used to time E* like this, but since phase 1 of the CTRL opened this pairing of departures has been the exception rather than the rule. There was apparently a problem at Waterloo International with trying to load up to 1500 passengers on to two trains on opposite sides of an island platform - congestion and the risk of sending Brussels passengers to Paris and vv. In the current timetable the only paired departures seem to be: 0629 Paris/0634 Brussels 1039 Paris/1042 Brussels 1909FO Paris/1912 Brussels 1034Su Paris/1037Su Brussels. Peter |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
LU delay compensation | London Transport | |||
Underground delay vouchers | London Transport | |||
stansted express delay | London Transport | |||
Train Delay Cartoon... | London Transport | |||
CTRL Domestics will run to Dover | London Transport News |