Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Thu, 25 Nov 2004, Dave Arquati wrote:
Tom Anderson wrote: On Wed, 24 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: On Tue, 23 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: "The second route would link Herts and Beds with Clapham Junction." Beds is probably wrong, although it's very much up in the air. Herts could get Crossrail 2 services; it depends if they decide to run any up the Lea Valley line. I hadn't heard about this idea (until i looked at your site, obviously). It's pretty obvious - Stratford, Lea Valley Line (more or less unused for passengers at the moment), Tottenham Hale, some set of stations to the north (hopefully Stansted). Is it being seriously considered? For some value of 'seriously' appropriate to the entirely hypothetical Crossrail 2, of course. It would seem sensible for Crossrail 2 to take over the "one" services from Stratford to Stansted and Hertford East starting next year, and enhance them - especially given the desire to regenerate the Lea Valley. A direct service from Stansted to the rest of Central London would also be a bonus, if Stansted is to be expanded. Strongly agreed. Of course, it would be yet another transport project which *just* misses Hackney - after the ELL, stepping over the border into Dalston and then fleeing to Islington, and the eternally promised but never delivered prospect of Chelsea-Hackney. Crossrail 2 *is* really Chelsea-Hackney Yes, i know - i just like the old name a lot more! The description "eternally promised but never delivered" is as true under this name as any previous. - just evolved. Hmph. In fact, it is generally proposed to serve Hackney (Central). The oft-proposed route is from King's Cross to Dalston (either via Highbury & Islington or via Angel and Essex Road), I hadn't heard of the Highbury & Islington option; is the idea to use the NLL as some sort of cost-saving measure? Ah, ignore me, you answer this below. then following the North London Line route to Stratford. If this route were chosen, then it would seem to be a long way round to serve the Lea Valley line from Stratford, and instead a branch might leave at Hackney to head for Stansted. KX - Dalston i like, but going to Stratford is madness. People in Stratford and beyond already have good ways into town, and no desire to go to Hackney. Clearly, the only sensible solution is up the West Anglia from Hackney. The problem with using the NLL route between Highbury and Stratford is that it would be difficult to replicate it in a tunnel thanks to the CTRL, and sharing tracks with the NLL itself would be a performance liability - especially given the heavy freight use, the 6tph proposed for the NLL and the further 4tph from the ELLX. Running Crossrail 2 this way could mean NLL services being cut back. Indeed. Seems to be an ineffective way of doing something undesirable. I'd give Hackney a good chance of being included in Crossrail 2, should it ever be built. After all, the GN will have Thameslink 2000 and the GE will have Crossrail 1 - there's really nowhere else for CR2 to go! Crossrail 3! tom -- 24-Hour Monkey-Vision! |
#2
![]() |
|||
|
|||
![]()
Tom Anderson wrote:
On Thu, 25 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: On Wed, 24 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: On Tue, 23 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: "The second route would link Herts and Beds with Clapham Junction." Beds is probably wrong, although it's very much up in the air. Herts could get Crossrail 2 services; it depends if they decide to run any up the Lea Valley line. I hadn't heard about this idea (until i looked at your site, obviously). It's pretty obvious - Stratford, Lea Valley Line (more or less unused for passengers at the moment), Tottenham Hale, some set of stations to the north (hopefully Stansted). Is it being seriously considered? For some value of 'seriously' appropriate to the entirely hypothetical Crossrail 2, of course. It would seem sensible for Crossrail 2 to take over the "one" services from Stratford to Stansted and Hertford East starting next year, and enhance them - especially given the desire to regenerate the Lea Valley. A direct service from Stansted to the rest of Central London would also be a bonus, if Stansted is to be expanded. Strongly agreed. Of course, it would be yet another transport project which *just* misses Hackney - after the ELL, stepping over the border into Dalston and then fleeing to Islington, and the eternally promised but never delivered prospect of Chelsea-Hackney. Crossrail 2 *is* really Chelsea-Hackney Yes, i know - i just like the old name a lot more! The description "eternally promised but never delivered" is as true under this name as any previous. 'Tis Chelsea that's more likely to be bypassed. - just evolved. Hmph. In fact, it is generally proposed to serve Hackney (Central). The oft-proposed route is from King's Cross to Dalston (either via Highbury & Islington or via Angel and Essex Road), I hadn't heard of the Highbury & Islington option; is the idea to use the NLL as some sort of cost-saving measure? Ah, ignore me, you answer this below. Hadn't that idea already been abandoned? then following the North London Line route to Stratford. If this route were chosen, then it would seem to be a long way round to serve the Lea Valley line from Stratford, and instead a branch might leave at Hackney to head for Stansted. KX - Dalston i like, but going to Stratford is madness. People in Stratford and beyond already have good ways into town, and no desire to go to Hackney. Clearly, the only sensible solution is up the West Anglia from Hackney. I couldn't disagree more. Firstly, although Stratford's links with much of Central London are good, there is no direct line to Kings Cross. Secondly, Hackney's links with Stratford are currently inadequate - the trains are infrequent, short and overcrowded. Thirdly, a well designed Hackney station would incorporate Hackney Downs station, so you would still get the benefits while the trains continue to serve the popular destination of Liverpool Street. The problem with using the NLL route between Highbury and Stratford is that it would be difficult to replicate it in a tunnel thanks to the CTRL, and sharing tracks with the NLL itself would be a performance liability - especially given the heavy freight use, the 6tph proposed for the NLL and the further 4tph from the ELLX. Running Crossrail 2 this way could mean NLL services being cut back. Indeed. Seems to be an ineffective way of doing something undesirable. But sharing between Dalston and Stratford would not be a problem, as NLL trains could be diverted to Bishopsgate and the ELL. I'd give Hackney a good chance of being included in Crossrail 2, should it ever be built. After all, the GN will have Thameslink 2000 and the GE will have Crossrail 1 - there's really nowhere else for CR2 to go! Crossrail 3! I can think of a lot of possible routes for more Crossrail lines. Unfortunately the routes aren't safeguarded, so constructing them would probably require a lot of buildings to be demolished. |
#3
![]() |
|||
|
|||
![]()
Aidan Stanger wrote:
Tom Anderson wrote: On Thu, 25 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: On Wed, 24 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: On Tue, 23 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: "The second route would link Herts and Beds with Clapham Junction." Beds is probably wrong, although it's very much up in the air. Herts could get Crossrail 2 services; it depends if they decide to run any up the Lea Valley line. I hadn't heard about this idea (until i looked at your site, obviously). It's pretty obvious - Stratford, Lea Valley Line (more or less unused for passengers at the moment), Tottenham Hale, some set of stations to the north (hopefully Stansted). Is it being seriously considered? For some value of 'seriously' appropriate to the entirely hypothetical Crossrail 2, of course. It would seem sensible for Crossrail 2 to take over the "one" services from Stratford to Stansted and Hertford East starting next year, and enhance them - especially given the desire to regenerate the Lea Valley. A direct service from Stansted to the rest of Central London would also be a bonus, if Stansted is to be expanded. Strongly agreed. Of course, it would be yet another transport project which *just* misses Hackney - after the ELL, stepping over the border into Dalston and then fleeing to Islington, and the eternally promised but never delivered prospect of Chelsea-Hackney. Crossrail 2 *is* really Chelsea-Hackney Yes, i know - i just like the old name a lot more! The description "eternally promised but never delivered" is as true under this name as any previous. 'Tis Chelsea that's more likely to be bypassed. RB Kensington & Chelsea are still clinging on to the hope that CR2 will serve somewhere in Chelsea. They're not entirely off their rockers - they consider a route from Victoria to Clapham Junction via Sloane Square, King's Road (presumably somewhere near the Town Hall) and Imperial Wharf to be desirable, and it would serve a larger population that a simple direct tunnel to the Junction. The other main option is via Battersea Park, and that would be popular with the Power Station developers. Interestingly, the CLRL map for CR2 shows an additional possible branch from Victoria which does *not* go to Clapham Junction. That would suggest a Chelsea & Putney route (which was in the original, safeguarded plans). - just evolved. Hmph. In fact, it is generally proposed to serve Hackney (Central). The oft-proposed route is from King's Cross to Dalston (either via Highbury & Islington or via Angel and Essex Road), I hadn't heard of the Highbury & Islington option; is the idea to use the NLL as some sort of cost-saving measure? Ah, ignore me, you answer this below. Hadn't that idea already been abandoned? then following the North London Line route to Stratford. If this route were chosen, then it would seem to be a long way round to serve the Lea Valley line from Stratford, and instead a branch might leave at Hackney to head for Stansted. KX - Dalston i like, but going to Stratford is madness. People in Stratford and beyond already have good ways into town, and no desire to go to Hackney. Clearly, the only sensible solution is up the West Anglia from Hackney. I couldn't disagree more. Firstly, although Stratford's links with much of Central London are good, there is no direct line to Kings Cross. Secondly, Hackney's links with Stratford are currently inadequate - the trains are infrequent, short and overcrowded. Thirdly, a well designed Hackney station would incorporate Hackney Downs station, so you would still get the benefits while the trains continue to serve the popular destination of Liverpool Street. Stratford will have a link to Farringdon with CR1; it's only a short hop from there to King's Cross. And an upgrade of the NLL would go towards improving links between Hackney and Stratford. I would say that giving the West Anglia lines (particularly the Lea Valley) a direct link to the West End would give greater regeneration benefits than going to Stratford, which will already have some impressive new links. The problem with using the NLL route between Highbury and Stratford is that it would be difficult to replicate it in a tunnel thanks to the CTRL, and sharing tracks with the NLL itself would be a performance liability - especially given the heavy freight use, the 6tph proposed for the NLL and the further 4tph from the ELLX. Running Crossrail 2 this way could mean NLL services being cut back. Indeed. Seems to be an ineffective way of doing something undesirable. But sharing between Dalston and Stratford would not be a problem, as NLL trains could be diverted to Bishopsgate and the ELL. Removing a direct orbital link between Stratford and northwest/west London would be a bad idea, IMHO. Interchange at Dalston would certainly not be easy, as the ELL station is at Dalston Junction. Perhaps a CR2 route from Essex Road to Haggerston station and then Hackney would be better - it could all be tunnelled (avoiding the CTRL tunnels, unlike the NLL route), and would mean a less awkward curve at Hackney if it took a West Anglia route. I'd give Hackney a good chance of being included in Crossrail 2, should it ever be built. After all, the GN will have Thameslink 2000 and the GE will have Crossrail 1 - there's really nowhere else for CR2 to go! Crossrail 3! I can think of a lot of possible routes for more Crossrail lines. Unfortunately the routes aren't safeguarded, so constructing them would probably require a lot of buildings to be demolished. We have east-west and a possible SW-NE. The other obvious connection is NW-SE, to give Watford DC services a direct link to the City, and adding extra capacity into London Bridge. The only problem there is that apparently there is already extensive overprovision of services between Queen's Park and Harrow. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
#4
![]() |
|||
|
|||
![]()
Dave Arquati wrote:
Aidan Stanger wrote: Tom Anderson wrote: On Thu, 25 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: (snip) Of course, it would be yet another transport project which *just* misses Hackney - after the ELL, stepping over the border into Dalston and then fleeing to Islington, and the eternally promised but never delivered prospect of Chelsea-Hackney. Crossrail 2 *is* really Chelsea-Hackney Yes, i know - i just like the old name a lot more! The description "eternally promised but never delivered" is as true under this name as any previous. 'Tis Chelsea that's more likely to be bypassed. RB Kensington & Chelsea are still clinging on to the hope that CR2 will serve somewhere in Chelsea. They're not entirely off their rockers - they consider a route from Victoria to Clapham Junction via Sloane Square, King's Road (presumably somewhere near the Town Hall) and Imperial Wharf to be desirable, and it would serve a larger population that a simple direct tunnel to the Junction. The other main option is via Battersea Park, and that would be popular with the Power Station developers. The best route IMO would be via Kings Road and West Battersea (the other side of Battersea Park from the Power Station). Interestingly, the CLRL map for CR2 shows an additional possible branch from Victoria which does *not* go to Clapham Junction. That would suggest a Chelsea & Putney route (which was in the original, safeguarded plans). - just evolved. Hmph. In fact, it is generally proposed to serve Hackney (Central). The oft-proposed route is from King's Cross to Dalston (either via Highbury & Islington or via Angel and Essex Road), I hadn't heard of the Highbury & Islington option; is the idea to use the NLL as some sort of cost-saving measure? Ah, ignore me, you answer this below. Hadn't that idea already been abandoned? then following the North London Line route to Stratford. If this route were chosen, then it would seem to be a long way round to serve the Lea Valley line from Stratford, and instead a branch might leave at Hackney to head for Stansted. KX - Dalston i like, but going to Stratford is madness. People in Stratford and beyond already have good ways into town, and no desire to go to Hackney. Clearly, the only sensible solution is up the West Anglia from Hackney. I couldn't disagree more. Firstly, although Stratford's links with much of Central London are good, there is no direct line to Kings Cross. Secondly, Hackney's links with Stratford are currently inadequate - the trains are infrequent, short and overcrowded. Thirdly, a well designed Hackney station would incorporate Hackney Downs station, so you would still get the benefits while the trains continue to serve the popular destination of Liverpool Street. Stratford will have a link to Farringdon with CR1; it's only a short hop from there to King's Cross. And an upgrade of the NLL would go towards improving links between Hackney and Stratford. I would say that giving the West Anglia lines (particularly the Lea Valley) a direct link to the West End would give greater regeneration benefits than going to Stratford, which will already have some impressive new links. But if the West Anglia lines gained a direct service to the West End, it would be at the expense of their direct service to the City, so they'd be worse off. Considering they already have the Victoria Line to the West End, and will also gain an interchange with Crossrail 2, I can't see how it would be worth it. The problem with using the NLL route between Highbury and Stratford is that it would be difficult to replicate it in a tunnel thanks to the CTRL, and sharing tracks with the NLL itself would be a performance liability - especially given the heavy freight use, the 6tph proposed for the NLL and the further 4tph from the ELLX. Running Crossrail 2 this way could mean NLL services being cut back. Indeed. Seems to be an ineffective way of doing something undesirable. But sharing between Dalston and Stratford would not be a problem, as NLL trains could be diverted to Bishopsgate and the ELL. Removing a direct orbital link between Stratford and northwest/west London would be a bad idea, IMHO. Interchange at Dalston would certainly not be easy, as the ELL station is at Dalston Junction. Perhaps a CR2 route from Essex Road to Haggerston station and then Hackney would be better - it could all be tunnelled (avoiding the CTRL tunnels, unlike the NLL route), and would mean a less awkward curve at Hackney if it took a West Anglia route. Why do you assume the CR2 station would not also be at Dalston Junction? There's plenty of room for it to surface there, and the curve linking it to the eastern section of the NLL wouldn't be too difficult to reinstate. Such a route would require less tunnelling and therfore be cheaper. Dalston Kingsland station would close, but Dalston Junction is so close that this would not matter much, especially considering the much better service it would get. I'd give Hackney a good chance of being included in Crossrail 2, should it ever be built. After all, the GN will have Thameslink 2000 and the GE will have Crossrail 1 - there's really nowhere else for CR2 to go! Crossrail 3! I can think of a lot of possible routes for more Crossrail lines. Unfortunately the routes aren't safeguarded, so constructing them would probably require a lot of buildings to be demolished. We have east-west and a possible SW-NE. The other obvious connection is NW-SE, to give Watford DC services a direct link to the City, and adding extra capacity into London Bridge. The only problem there is that apparently there is already extensive overprovision of services between Queen's Park and Harrow. The best solution, as I've said previously, would be to let Crossrail 1 take over the slow lines (NOT the DC lines) on the WCML, with cross platform interchange at Willesden Junction, and run trains to Wolverton (Milton Keynes) and possibly Northampton. LU would then take over the DC lines and run its trains to Euston, and a freight route would be created from Willesden to the NLL. |
#5
![]() |
|||
|
|||
![]()
Aidan Stanger wrote:
Dave Arquati wrote: Aidan Stanger wrote: Tom Anderson wrote: On Thu, 25 Nov 2004, Dave Arquati wrote: Tom Anderson wrote: (snip) Of course, it would be yet another transport project which *just* misses Hackney - after the ELL, stepping over the border into Dalston and then fleeing to Islington, and the eternally promised but never delivered prospect of Chelsea-Hackney. Crossrail 2 *is* really Chelsea-Hackney Yes, i know - i just like the old name a lot more! The description "eternally promised but never delivered" is as true under this name as any previous. 'Tis Chelsea that's more likely to be bypassed. RB Kensington & Chelsea are still clinging on to the hope that CR2 will serve somewhere in Chelsea. They're not entirely off their rockers - they consider a route from Victoria to Clapham Junction via Sloane Square, King's Road (presumably somewhere near the Town Hall) and Imperial Wharf to be desirable, and it would serve a larger population that a simple direct tunnel to the Junction. The other main option is via Battersea Park, and that would be popular with the Power Station developers. The best route IMO would be via Kings Road and West Battersea (the other side of Battersea Park from the Power Station). Serving West Battersea is a good objective, but so is southwest Chelsea (i.e. Sands End). Stations at Worlds End (Chelsea) and Battersea High St (possibly with additional platforms on the WLL) would serve both traffic objectives. In the short term, a footbridge adjacent to the rail bridge at Sands End would give people in West Battersea a relatively short link to the new station at Imperial Wharf. (snip) then following the North London Line route to Stratford. If this route were chosen, then it would seem to be a long way round to serve the Lea Valley line from Stratford, and instead a branch might leave at Hackney to head for Stansted. KX - Dalston i like, but going to Stratford is madness. People in Stratford and beyond already have good ways into town, and no desire to go to Hackney. Clearly, the only sensible solution is up the West Anglia from Hackney. I couldn't disagree more. Firstly, although Stratford's links with much of Central London are good, there is no direct line to Kings Cross. Secondly, Hackney's links with Stratford are currently inadequate - the trains are infrequent, short and overcrowded. Thirdly, a well designed Hackney station would incorporate Hackney Downs station, so you would still get the benefits while the trains continue to serve the popular destination of Liverpool Street. Stratford will have a link to Farringdon with CR1; it's only a short hop from there to King's Cross. And an upgrade of the NLL would go towards improving links between Hackney and Stratford. I would say that giving the West Anglia lines (particularly the Lea Valley) a direct link to the West End would give greater regeneration benefits than going to Stratford, which will already have some impressive new links. But if the West Anglia lines gained a direct service to the West End, it would be at the expense of their direct service to the City, so they'd be worse off. Considering they already have the Victoria Line to the West End, and will also gain an interchange with Crossrail 2, I can't see how it would be worth it. Fair enough, they'd be worse off if CR2 replaced their direct services to the City. However, extra capacity and better connections will be urgently needed further up the Lea Valley and near to Stansted will be needed if government plans for significant house-building in this area are given the go-ahead. The Victoria line will also be in urgent need of congestion relief. Taking over the Central Line from Stratford serves neither objective, especially as Central Line services will see significantly reduced crowding thanks to Crossrail 1 (and that includes points beyond Stratford, as higher frequencies and quicker journey times will attract some travellers who currently have a choice of Central Line or Great Eastern - especially once East London Transit is in place to feed Crossrail Great Eastern stations). The problem with using the NLL route between Highbury and Stratford is that it would be difficult to replicate it in a tunnel thanks to the CTRL, and sharing tracks with the NLL itself would be a performance liability - especially given the heavy freight use, the 6tph proposed for the NLL and the further 4tph from the ELLX. Running Crossrail 2 this way could mean NLL services being cut back. Indeed. Seems to be an ineffective way of doing something undesirable. But sharing between Dalston and Stratford would not be a problem, as NLL trains could be diverted to Bishopsgate and the ELL. Removing a direct orbital link between Stratford and northwest/west London would be a bad idea, IMHO. Interchange at Dalston would certainly not be easy, as the ELL station is at Dalston Junction. Perhaps a CR2 route from Essex Road to Haggerston station and then Hackney would be better - it could all be tunnelled (avoiding the CTRL tunnels, unlike the NLL route), and would mean a less awkward curve at Hackney if it took a West Anglia route. Why do you assume the CR2 station would not also be at Dalston Junction? There's plenty of room for it to surface there, and the curve linking it to the eastern section of the NLL wouldn't be too difficult to reinstate. I was thinking if the CR2 route ran from Highbury rather than Essex Road (I didn't make that clear!). Such a route would require less tunnelling and therfore be cheaper. Dalston Kingsland station would close, but Dalston Junction is so close that this would not matter much, especially considering the much better service it would get. If the NLL were rerouted at Dalston, interchange for passengers on existing NLL flows from Hampstead, Camden and Islington to Stratford and vice versa would add inconvenience to those journeys, unless cross-platform or top-to-bottom (e.g. Canning Town) interchange could be achieved. This is one of the reasons many Richmond residents were unhappy about their branch of Crossrail 1. I'd give Hackney a good chance of being included in Crossrail 2, should it ever be built. After all, the GN will have Thameslink 2000 and the GE will have Crossrail 1 - there's really nowhere else for CR2 to go! Crossrail 3! I can think of a lot of possible routes for more Crossrail lines. Unfortunately the routes aren't safeguarded, so constructing them would probably require a lot of buildings to be demolished. We have east-west and a possible SW-NE. The other obvious connection is NW-SE, to give Watford DC services a direct link to the City, and adding extra capacity into London Bridge. The only problem there is that apparently there is already extensive overprovision of services between Queen's Park and Harrow. The best solution, as I've said previously, would be to let Crossrail 1 take over the slow lines (NOT the DC lines) on the WCML, with cross platform interchange at Willesden Junction, and run trains to Wolverton (Milton Keynes) and possibly Northampton. LU would then take over the DC lines and run its trains to Euston, and a freight route would be created from Willesden to the NLL. If the Felixstowe-Nuneaton gauge enhancement project were completed properly, then the amount of freight traffic on the NLL could be reduced significantly. The freight route you mention wouldn't be any different than before, as it would still have to share the same tracks with the same services. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
#6
![]() |
|||
|
|||
![]()
"Dave Arquati" wrote in message
... The best solution, as I've said previously, would be to let Crossrail 1 take over the slow lines (NOT the DC lines) on the WCML, with cross platform interchange at Willesden Junction, and run trains to Wolverton (Milton Keynes) and possibly Northampton. LU would then take over the DC lines and run its trains to Euston, and a freight route would be created from Willesden to the NLL. If the Felixstowe-Nuneaton gauge enhancement project were completed properly, then the amount of freight traffic on the NLL could be reduced significantly. The freight route you mention wouldn't be any different than before, as it would still have to share the same tracks with the same services. I remember one plan postulated when the East-West Rail study was commissioned a few years ago was to make Goblin the primary cross-London freight line (with a new junction at Forest Gate and a new tunnel from Gospel Oak to Primrose Hill)? Its advantages being that it avoids freight clashing with Crossrail on the GE, and removes any freight activity from the NLL (and WLL if you route Channel freight via the CTRL at Dagenham). Any news on that plan? Cheers Angus |
#7
![]() |
|||
|
|||
![]()
Angus Bryant wrote:
"Dave Arquati" wrote in message ... The best solution, as I've said previously, would be to let Crossrail 1 take over the slow lines (NOT the DC lines) on the WCML, with cross platform interchange at Willesden Junction, and run trains to Wolverton (Milton Keynes) and possibly Northampton. LU would then take over the DC lines and run its trains to Euston, and a freight route would be created from Willesden to the NLL. If the Felixstowe-Nuneaton gauge enhancement project were completed properly, then the amount of freight traffic on the NLL could be reduced significantly. The freight route you mention wouldn't be any different than before, as it would still have to share the same tracks with the same services. I remember one plan postulated when the East-West Rail study was commissioned a few years ago was to make Goblin the primary cross-London freight line (with a new junction at Forest Gate and a new tunnel from Gospel Oak to Primrose Hill)? Its advantages being that it avoids freight clashing with Crossrail on the GE, and removes any freight activity from the NLL (and WLL if you route Channel freight via the CTRL at Dagenham). Any news on that plan? I remember the plan too but I haven't heard anything since. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
#8
![]() |
|||
|
|||
![]()
On Mon, 29 Nov 2004, Angus Bryant wrote:
"Dave Arquati" wrote in message ... The best solution, as I've said previously, would be to let Crossrail 1 take over the slow lines (NOT the DC lines) on the WCML, with cross platform interchange at Willesden Junction, and run trains to Wolverton (Milton Keynes) and possibly Northampton. LU would then take over the DC lines and run its trains to Euston, and a freight route would be created from Willesden to the NLL. If the Felixstowe-Nuneaton gauge enhancement project were completed properly, then the amount of freight traffic on the NLL could be reduced significantly. I remember one plan postulated when the East-West Rail study was commissioned a few years ago was to make Goblin the primary cross-London freight line (with a new junction at Forest Gate and a new tunnel from Gospel Oak to Primrose Hill)? Its advantages being that it avoids freight clashing with Crossrail on the GE, and removes any freight activity from the NLL (and WLL if you route Channel freight via the CTRL at Dagenham). Any news on that plan? TfL recently did a report called "Freight on rail in London": http://www.tfl.gov.uk/rail/downloads/pdf/freight.pdf They don't say too much about it - their emphasis being on the Felixtowe - Nuneaton bypass - but they do say that the proposed port development at Shellhaven, "cannot be supported without [...] upgrades to the Tottenham and Hampstead Line and the Hampstead section of the North London Line at some point.". 'Tottenham and Hampstead Line' is code (or even the traditional name) for Goblin. The East-West study you mention has the more involved idea of a 'freight focused route': http://www.sra.gov.uk/publications/g...03eastwest.pdf And is more explicit, not to mention ambitious. The tunnel bit is about bypassing the Hampstead Tunnel, which is clear to W8 gauge, not big enough for heavy cargo. They then go on to suggest, for a mere 215 million, a tunnel under the Thames, so traffic from Kent can get up onto the GOBLin, thus relieving all the south London lines and the WLL and Hounslow Loop. Incidentally, that report puts the cost of a Wimbledon to Hackney route (ie Chelsea-Hackney, aka Crossrail 2) at 5.3 bn, as opposed to 2.8 bn for Crossrail 1 (although i think that's without the tunnel going as far as Stratford, and without the entire Kent - oops, sorry, Docklands - branch). tom -- A is for Absinthe, for which I now thirst |
#9
![]() |
|||
|
|||
![]()
On Mon, 29 Nov 2004, Dave Arquati wrote:
Aidan Stanger wrote: Dave Arquati wrote: Aidan Stanger wrote: Tom Anderson wrote: On Thu, 25 Nov 2004, Dave Arquati wrote: then following the North London Line route to Stratford. Clearly, the only sensible solution is up the West Anglia from Hackney. I couldn't disagree more. Firstly, although Stratford's links with much of Central London are good, there is no direct line to Kings Cross. It's always Stratford, Stratford, Stratford! What's so great about Stratford anyway? Bah! Secondly, Hackney's links with Stratford are currently inadequate - the trains are infrequent, short and overcrowded. Thirdly, a well designed Hackney station would incorporate Hackney Downs station, so you would still get the benefits while the trains continue to serve the popular destination of Liverpool Street. Stratford will have a link to Farringdon with CR1; it's only a short hop from there to King's Cross. And an upgrade of the NLL would go towards improving links between Hackney and Stratford. I would say that giving the West Anglia lines (particularly the Lea Valley) a direct link to the West End would give greater regeneration benefits than going to Stratford, which will already have some impressive new links. But if the West Anglia lines gained a direct service to the West End, it would be at the expense of their direct service to the City, so they'd be worse off. Fair enough, they'd be worse off if CR2 replaced their direct services to the City. It wouldn't have to replace it - there could be two routes south from Hackney. I'm not sure if this would be a good idea from an operational point of view, though - shades of the Bakerloo. On the other hand, if this was going to be CR2 rather than CH, ie a NR-style moderate-frequency timetabled service, rather than a LU-style high-frequency random service, it might work alright. However, extra capacity and better connections will be urgently needed further up the Lea Valley and near to Stansted will be needed if government plans for significant house-building in this area are given the go-ahead. A CR1 branch up the Lea Valley Line would do this, though. I refuse to believe CR1 can't support three interfaces at each end. Or, if it's stuck at two, maybe this route will be added when the Docklands branch is eventually cut back to non-existence! The Victoria line will also be in urgent need of congestion relief. Taking over the Central Line from Stratford serves neither objective, And that's the rub - even if CH did take over the NLL route to Stratford, where would it go afterwards? The Central Line is daft, the GE's Crossrailed already, which basically only leaves the Lea Valley Line - and KX - Hackney - Stratford - Tottenham Hale is, if you'll excuse the pun, completely loopy! Unless you're proposing to take over the DLR? tom -- A is for Absinthe, for which I now thirst |
#10
![]() |
|||
|
|||
![]()
Tom Anderson wrote:
On Mon, 29 Nov 2004, Dave Arquati wrote: Aidan Stanger wrote: Dave Arquati wrote: Aidan Stanger wrote: Tom Anderson wrote: On Thu, 25 Nov 2004, Dave Arquati wrote: then following the North London Line route to Stratford. Clearly, the only sensible solution is up the West Anglia from Hackney. I couldn't disagree more. Firstly, although Stratford's links with much of Central London are good, there is no direct line to Kings Cross. It's always Stratford, Stratford, Stratford! What's so great about Stratford anyway? Bah! Secondly, Hackney's links with Stratford are currently inadequate - the trains are infrequent, short and overcrowded. Thirdly, a well designed Hackney station would incorporate Hackney Downs station, so you would still get the benefits while the trains continue to serve the popular destination of Liverpool Street. Stratford will have a link to Farringdon with CR1; it's only a short hop from there to King's Cross. And an upgrade of the NLL would go towards improving links between Hackney and Stratford. I would say that giving the West Anglia lines (particularly the Lea Valley) a direct link to the West End would give greater regeneration benefits than going to Stratford, which will already have some impressive new links. But if the West Anglia lines gained a direct service to the West End, it would be at the expense of their direct service to the City, so they'd be worse off. Fair enough, they'd be worse off if CR2 replaced their direct services to the City. It wouldn't have to replace it - there could be two routes south from Hackney. I'm not sure if this would be a good idea from an operational point of view, though - shades of the Bakerloo. On the other hand, if this was going to be CR2 rather than CH, ie a NR-style moderate-frequency timetabled service, rather than a LU-style high-frequency random service, it might work alright. Crossrail 1 will be a very high frequency (24tph) LU-style service in the centre, with pretty high frequency on the eastern branches (12 + 12 tph, plus extras on the Gt Eastern). I imagine Crossrail 2 would be the same on the central core - it's too expensive to pass a cost-benefit analysis otherwise. The frequency at Hackney would depend on whether any branches (like Finchley) diverged before it. Even if a Finchley branch diverged, Hackney would still probably receive 12tph which need to continue somewhere (e.g. up the Lea Valley). However, extra capacity and better connections will be urgently needed further up the Lea Valley and near to Stansted will be needed if government plans for significant house-building in this area are given the go-ahead. A CR1 branch up the Lea Valley Line would do this, though. I refuse to believe CR1 can't support three interfaces at each end. Or, if it's stuck at two, maybe this route will be added when the Docklands branch is eventually cut back to non-existence! If 12tph are needed for the Great Eastern and 12tph are needed for Canary Wharf, how are you going to fit more trains through the central tunnel! Anyway, I believe this discussion has been done at length in the past :-) The Victoria line will also be in urgent need of congestion relief. Taking over the Central Line from Stratford serves neither objective, And that's the rub - even if CH did take over the NLL route to Stratford, where would it go afterwards? The Central Line is daft, the GE's Crossrailed already, which basically only leaves the Lea Valley Line - and KX - Hackney - Stratford - Tottenham Hale is, if you'll excuse the pun, completely loopy! Unless you're proposing to take over the DLR? The original Crossrail 2 proposal serving Stratford envisaged taking over the Central line to Epping (leaving Central line services to the Hainault Loop) and the North London Line to North Woolwich! The arrival of Crossrail 1 in the Royal Docks and of the DLR extensions obviates the need for that branch. I also think substituting the NLL between Dalston and Stratford would be a very bad idea; a significant customer base for orbital journeys has developed along the NLL. I've used the NLL occasionally in the off-peaks, and the trains are always fully seated or overcrowded. I believe you're right; those Crossrail 2 trains should be routed up the Lea Valley line. Not all 12tph have to run beyond Hackney; perhaps 8tph could fit into the Lea Valley services, retaining a direct service to Liverpool Street, but allowing passengers to be distributed to other nodes like Dalston Junction, Essex Road and Angel where they can pick up services to different parts of the City if more convenient. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
BBC - Soho shops make way for Crossrail | London Transport | |||
BBC - Soho shops make way for Crossrail | London Transport | |||
BBC - US firm 'set for Crossrail deal' | London Transport | |||
BBC News Report - Crossrail | London Transport | |||
BBC - Crossrail gets £230m BAA funding | London Transport |