Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#8
![]() |
|||
|
|||
![]()
Tubeprune wrote:
Yes, the D Stock bogie replacement is now complete. The D Stock is now starting a body refurbishment. For other queries on this topic, the new SSL Stock has been designed to the A Stock gauge and Metronet are arguing with Bombardier over it because Metronet don't want to pay for all the infrastructure work necessary to allow the new stock to run all over the SSL. Cars are standard 3 d/doors/side with cabs at the ends of trains only. Wide walk-through ends will be provided unless LU insist on end doors as per their standards. Thanks for letting us know about this. Will you be updating your excellent site soon to share this new knowledge? No of trains will be: 72 x 8-cars for the Metropolitan from 2009 What sort of seats will these trains have? Presumably the stock will all be the exact same, differing only in seating. 40 x 6-cars for Circle & H&C from 2012 78 x 7-cars for District from 2014 Again, what will the seating arrangements be? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
2009 Stock loading gauge | London Transport | |||
Loading gauge question | London Transport | |||
CTRL loading gauge | London Transport | |||
DLR track gauge | London Transport | |||
LUL track gauge not the same as BR gauge? | London Transport |