London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #4   Report Post  
Old December 8th 04, 09:55 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2004
Posts: 1
Default Northern line radios

But witch is the largest risk?

a) travelling in a tube train with a failed radio system

b) having to drive to work, due to the tube train not running



Given the greater risk of accidents on the road each a tube or rail line is
such down. What sort of safety case is needed before an operator is allowed
to such down a line or cancel trains for 'safety reasons'?



"Steve Dulieu" wrote in message
.uk...

"David Walters" wrote in message
...
What is it about the Northern line train radios not working that
stops the usual service pattern (particularly trains from both
Edgware and High Barnet taking both central branches) from running?

Part of the job of the train radio is to carry the train radio alarm
traffic
that notifies the Line Controller in the event that a train becomes
stalled
in a tunnel due to an incapacitated Train Operator (due to EG heart
attack)
I'm not familiar with the Northern stock, but on the Picc. if the deadman
is
released for 60 seconds an alarm starts to sound in the cab. Should the
driver not respond to this alarm in the following 30 seconds the OPO alarm
is operated, this sends a radio signal to the Controller and illuminated
the
"calling on" light on the rear of the train. Should this happen, the
equipment allows the Controller to open up the trains PA to inform
passengers (and possibly ask for any member of staff travelling on the
train
to go to the front cab and find out what's going on). The radio is also
required to contact the train behind and get that Operator to trip his
train
forward and instigate the "stepping through" procedure. All of this was
required as part of the railway safety case that LUL had to present to
HMRI
to get them to allow the introduction of OPO train operation on deep level
tube lines, previously all of these functions would have been performed by
the Guard.
HTH
--
Cheers, Steve.
Change from jealous to sad to reply.




 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Getting from Finchley to Bank with no Northern Line Andy Coleman London Transport 5 October 23rd 03 07:43 PM
Normal Northern Line service not resuming this week + pictures [email protected] London Transport 7 October 23rd 03 03:07 PM
Northern Line J. Public London Transport 3 October 22nd 03 01:27 PM
Northern Line - again! [email protected] London Transport 32 August 22nd 03 08:38 PM
Northern line emergency engineering Phil Richards London Transport 0 July 25th 03 07:56 AM


All times are GMT. The time now is 02:25 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017