Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
One might think that a journey from the outskirts of London into the
centre would be quickest via a fast National Rail operator, like c2c vs the District line from Upminster into the City. I made a journey from High Wycombe into Kensington last week. Usually I take a train into Marylebone, then either use Bakerloo+ Circle, Bakerloo+Piccadilly or Circle from Edgware Road to reach Gloucester Road, taking about an hour and a quarter in total. However, this time, I only had a ticket between Wycombe and South Ruislip, having used the Tube to reach Ruislip on the outward journey as I started at Holland Park earlier in the day. The bonus of using the Tube from South Ruislip is the cheap Oyster fare in the offpeak. I definitely didn't expect to travel from Wycombe to Gloucester Road in almost exactly an hour. It turns out that the Central is very quick from Ruislip to Notting Hill Gate (23 mins), only a few minutes more than the time it takes any Chiltern train stopping at Ruislip to reach Marylebone (20 mins minimum). Obviously this is advantageous in reaching western areas. This doesn't really apply to the faster trains which skip the Ruislips - but even an ideal scenario with a non-stop train (usually taking around 33 mins) from Wycombe to Marylebone, followed by a 5-min walk and a Circle journey from Edgware Road (13 mins) gets you to Gloucester Road in 51 minutes. Although my hour-only journey via the Central line involved just a minute's wait at both South Ruislip and Notting Hill Gate, it also involves a tortuous interchange at Notting Hill and, in this case, an all-stations train from Wycombe (including a stop at the fantastic Denham Golf Club). -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Chiltern Line Electrification - Roger Ford's solution to WestMidlands Capacity Issues? | London Transport | |||
Reduction in Chiltern Services and Funding of Shared Met Line | London Transport | |||
Huge Tunnel across Chiltern Line at Gerrards Cross | London Transport | |||
Chiltern line at Marylebone this Evening | London Transport | |||
Chiltern plans for West Hampstead | London Transport |