London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #5   Report Post  
Old February 3rd 05, 01:22 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2004
Posts: 341
Default Northern Line Terminating at Euston

Brimstone wrote:
Euston Loop? Can you tell us more about this?


Back in the days when the Bank branch platforms of the Northern Line at
Euston were either face of an island platform (like Clapham Common),
there was a scissors crossover south of the platforms to allow C&SLR
trains to reverse south to Kennington and Clapham. When the C&SLR was
connected to the CCE&HR at Camden Town and the Charing Cross/Bank
branches formed, the scissors geometry was simplified to a single
trailing crossover. Later, a link was installed between the NB tunnel
and the Piccadilly Line; this is the Kings Cross Loop, and is the only
track connection (out of two planned*) between the Northern and the
rest of the LU combine.

When the Victoria Line arrived, the NB track of the Northern Line, Bank
branch, was diverted quite a distance south of Euston into a new
alignment, and the Victoria Line brought between the two lines,
facilitating cros-platform interchange. However, the presence of the
trailing crossover was deemed to be too useful to the line, so instead
of filling in the original NB tunnel north of the divergence, a
step-plate junction was built.

Now, a NB train gets a feather to enter the original NB tunnel, travel
across the crossover and stop in Euston Bank branch SB platform, where
they change ends and head off towards Kennington and Morden.


* - the other one was a planned connection between the Bakerloo and the
CCE&HR extension between Waterloo and Kennington; later it was
downgraded to a non-track connection, and then later forgotten. I could
be wrong about this though.



 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Terminating in a through platform then returning "wrong direction" [email protected] London Transport 16 June 18th 10 10:37 PM
Northern Line trains terminating at Euston (southbound Bank branch) [email protected] London Transport 11 January 30th 07 07:36 AM
Archway Terminating Tube. [email protected] London Transport 0 April 12th 06 12:47 AM
GNER trains terminating at Peterborough - why? Tony Bryer London Transport 6 July 9th 05 08:39 AM
Southbound train via Bank terminating at Kennington? Sir Benjamin Nunn London Transport 6 December 13th 04 11:13 PM


All times are GMT. The time now is 12:53 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017