Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Martin J wrote:
Does anyone know why the junk yard next to the East London line platform at New Cross Gate has finally been cleared and some trackside work is going on? Is this related to East London Line extension? I wouldn't have thought so, as, AFAIK, the southern extension hasn't got funding as yet. And also, AFAIK, the track will just be extended southbound alongside the existing railway lines; the northbound track coming from Brockley will go through New Cross Gate then there'll be a flyover across the railway to connect it to the existing tube line. So no idea really why the junk yard is being cleared! Patrick |
#2
![]() |
|||
|
|||
![]()
The Only Living Boy in New Cross wrote:
Martin J wrote: Does anyone know why the junk yard next to the East London line platform at New Cross Gate has finally been cleared and some trackside work is going on? Is this related to East London Line extension? I wouldn't have thought so, as, AFAIK, the southern extension hasn't got funding as yet. And also, AFAIK, the track will just be extended southbound alongside the existing railway lines; the northbound track coming from Brockley will go through New Cross Gate then there'll be a flyover across the railway to connect it to the existing tube line. s/flyover/diveunder. So no idea really why the junk yard is being cleared! Staging area for materials perhaps? Patrick |
#3
![]() |
|||
|
|||
![]()
"The Only Living Boy in New Cross" wrote in
message om... Martin J wrote: Does anyone know why the junk yard next to the East London line platform at New Cross Gate has finally been cleared and some trackside work is going on? Is this related to East London Line extension? I wouldn't have thought so, as, AFAIK, the southern extension hasn't got funding as yet. The extension to Peckham hasn't been funded, but the New Cross Gate link is necessary for the Northern extension because otherwise the new depot at Selhurst for all the extra trains would be unreachable. -- John Rowland - Spamtrapped Transport Plans for the London Area, updated 2001 http://www.geocities.com/Athens/Acro...69/tpftla.html A man's vehicle is a symbol of his manhood. That's why my vehicle's the Piccadilly Line - It's the size of a county and it comes every two and a half minutes |
#4
![]() |
|||
|
|||
![]()
On 3 Feb 2005 05:53:57 -0800, "TheOneKEA" wrote:
The Only Living Boy in New Cross wrote: Martin J wrote: Does anyone know why the junk yard next to the East London line platform at New Cross Gate has finally been cleared and some trackside work is going on? Is this related to East London Line extension? I wouldn't have thought so, as, AFAIK, the southern extension hasn't got funding as yet. And also, AFAIK, the track will just be extended southbound alongside the existing railway lines; the northbound track coming from Brockley will go through New Cross Gate then there'll be a flyover across the railway to connect it to the existing tube line. s/flyover/diveunder. So no idea really why the junk yard is being cleared! Staging area for materials perhaps? Patrick John Rowlan is correct with his post. The south bound line will not run adjacent to the Down Slow line from New Cross Gate, it will run on it! Christine Life without sex just isn't life. Make love not war! |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New Cross Gate to Shepherd's Bush via Crystal Palace | London Transport | |||
New Cross gate to West Croydon/Crystal Palace | London Transport | |||
New Cross Gate Oyster | London Transport | |||
New Cross Gate Query | London Transport | |||
Work at New Cross Gate Underground platform | London Transport |