Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
"Peter Lawrence" wrote in message
... LU have announced that Herts CC have made a 'final' submission to the DfT for funding for this project. The total cost is £65M (or ws last year) and TfL is contributing £18M of this. Is there a map showing the route of the link between the LU branch to Watford LU and the disused Railtrack branch to Croxley Green? I presume that Watford LU will be taken out of use, in the same way that Charing Cross (Jubilee) is now redundant after the extension to Westminster and beyond. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Croxley Link progress | London Transport | |||
Croxley Link progress | London Transport | |||
Croxley Link progress | London Transport | |||
Croxley Link progress | London Transport | |||
Croxley Link progress | London Transport |