Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
I went past Totteridge station today and noticed that the ground frame
appeared to be partially in pieces and soaked with various lubricants; the emergency trailing crossover in the four-foot appeared to be equally treated. Is this frame due to be recommissioned soon? And if it is, does anyone know what rusty rail move will be inaugurated to test it? |
#2
![]() |
|||
|
|||
![]() |
#3
![]() |
|||
|
|||
![]()
wrote:
Sorry about the late comment, but I kept forgetting to check the details out. Apparently it appears to have been re-commissioned of sorts by Tubelines and was used by engineering trains during the recent Barnet branch shut down. I'm not sure when it will be recommissioned for use by passenger trains though. What sort of work would be needed for the frame to be used by passenger trains? Would the layout need to be modified? http://www.trainweb.org/tubeprune/Totteridge-ltt5-2.gif refers. |
#4
![]() |
|||
|
|||
![]()
snip
Um, I suppose one major change might be to add a wrong road starter to the rear of the N/B platform, so that T/Ops know the points won't chuck a wobbly on them ;-) |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Totteridge & Whetstone Platform Building | London Transport | |||
Totteridge & Whetstone / Oakleigh Park BR | London Transport | |||
Totteridge & Whetstone / Oakleigh Park BR | London Transport | |||
Above or Below Ground??? | London Transport | |||
does the tube come above ground at all? | London Transport |