Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
I was supprised today to read in the leaflet for the conservative
candidate in Putney that: "LU have agreed to add an extra carriage to Edgware Road tubes" Is this possible? I thought the platforms were shorter beyond High St Ken? Where are the carriages coming from - will there be less but longer trains? Or did she make it up? -- Chris |
#2
![]() |
|||
|
|||
![]()
Chris! wrote:
I was supprised today to read in the leaflet for the conservative candidate in Putney that: "LU have agreed to add an extra carriage to Edgware Road tubes" Is this possible? I thought the platforms were shorter beyond High St Ken? Where are the carriages coming from - will there be less but longer trains? Or did she make it up? The new common subsurface stock, due in 2011ish, will have walk-through connections between carriages, and I believe it will have shorter carriages too - presumably enabling it to run anywhere on the subsurface network. Someone may be along shortly to correct me. What I doubt is that any particular MP had anything to do with the specification of the new SSL trains. -- Dave Arquati Imperial College, SW7 www.alwaystouchout.com - Transport projects in London |
#3
![]() |
|||
|
|||
![]() |
#4
![]() |
|||
|
|||
![]() |
#5
![]() |
|||
|
|||
![]() Colin Rosenstiel wrote: In article .com, (Chris!) wrote: Or did she make it up? If it's like content in other leaflets of hers I saw, I expect so. It did suprise me that she says she will campaign for signal / track replacement on the branch yet apparently this is happening on the 20th-23rd May anyway -- Chris |
#6
![]() |
|||
|
|||
![]()
On Sat, 23 Apr 2005 15:01:32 +0100, Dave Arquati wrote:
Chris! wrote: I was supprised today to read in the leaflet for the conservative candidate in Putney that: "LU have agreed to add an extra carriage to Edgware Road tubes" Is this possible? I thought the platforms were shorter beyond High St Ken? Where are the carriages coming from - will there be less but longer trains? Or did she make it up? The new common subsurface stock, due in 2011ish, will have walk-through connections between carriages, and I believe it will have shorter carriages too - presumably enabling it to run anywhere on the subsurface network. Someone may be along shortly to correct me. What I doubt is that any particular MP had anything to do with the specification of the new SSL trains. IIRC there is a contract option to allow for 7 car instead of 6 car operation on the Circle, H&C and Wimbleware part of the SSL network. I think the prospective parliamentary candidate may be referring to that. I shall have to check to see if LUL has exercised that option or not. -- Paul C Admits to working for London Underground! |
#7
![]() |
|||
|
|||
![]() Paul Corfield wrote: IIRC there is a contract option to allow for 7 car instead of 6 car operation on the Circle, H&C and Wimbleware part of the SSL network. I think the prospective parliamentary candidate may be referring to that. I shall have to check to see if LUL has exercised that option or not. Hi Paul, Thanks Would those 7 cars be the same total length as the current 6 then? Or would platforms need extending? Or am I completely wrong in thinking the current 6 car ones fill the platform at some stations. -- Chris |
#8
![]() |
|||
|
|||
![]() |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Lengthening trains on the circle and Edgeware road branch of theDistrict lines | London Transport | |||
DfT consults on extra rail powers for Mayor | London Transport News | |||
"Extra" buses | London Transport | |||
Thabks to Chiltern - but how about extra carriages? | London Transport | |||
Curious extra station stops on Southern's Watford-Brighton service | London Transport |