Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
![]() |
|||
|
|||
![]()
Mark Brader wrote:
I've not seen the 2009 date suggested before, but people have been trying to get rid of the Circle for at least 70 years. If one wanted to go further back neither the Metropolitan nor the District Railways wanted it in the first place. The fact that the Metropolitan created the District Railway shows that they did want it "in the first place". The Met didn't create the District, it was a seperate company and the two spent more time arguiing and at odds with each other than anything else. It is also documented that neither the Met nor District wanted the Circle to be completed because they had to be forced by an independent Act of Parliament to build it. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
district line closing time | London Transport | |||
Why do they keep closing Kings X in the rush hour? | London Transport | |||
"Circle Line should be up and running within a fortnight" | London Transport | |||
London Transport Museum Closing | London Transport | |||
Tube door opening and closing times | London Transport |