Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#9
![]() |
|||
|
|||
![]()
Roland Perry wrote:
In message . com, at 15:46:09 on Thu, 26 May 2005, ONscotland remarked: I read that LUL are withdrawing the "Circle" line service, as it causes far too many delays at the various bottlenecks on the route. Naturally, the lines will still be there (ie: H&C, Met and District Line will still have services), but without a circular service operating. The nickname "tea-cup" was mentioned, as this will basically cover the stylised map of new routes that will be utilised. Does anyone have any other details on this: or is it just another plan that is being considered? Like Clive, I've not heard of a recent plan; but there was a scrap-the- circle plan a couple of years ago which seemed to entail running Hammersmith and City services on a "loop the loop" basis: running along the north of the Circle, round the bottom and round the top again before exiting east. Isn't this effectively what happens now, though? Only difference being the number of loops before exiting stage left. Robin |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
district line closing time | London Transport | |||
Why do they keep closing Kings X in the rush hour? | London Transport | |||
"Circle Line should be up and running within a fortnight" | London Transport | |||
London Transport Museum Closing | London Transport | |||
Tube door opening and closing times | London Transport |