Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]() This weekend the Met line will be closed between Wembley Park and Aldgate. This is despite that stretch of line closing almost every weekend from September 2004 to may 2005 for the Wembley rebuild. During that time Chiltern railways put on extra trains to cope with the mass of people trying to get to/from London, but as Marylebone is now closed most weekends in June/July there will be no direct link into London from Amersham southwards. Couple of questions: Was it really not possible to do this work on the Met line during the past 30 odd weekends? Who is responsible for co-ordinating work between network rail and Metronet to try and ensure this kind of thing doesn't happen? Dave -- Dave B |
#2
![]() |
|||
|
|||
![]()
It probably would have been possible to do the work during the wobble
park shutdowns, but I think I'm correct in saying that the District line was shutdown over the same weekends, Metrocrap probably only have enough staff for 1 weekend shutdown at a time (although someone will probably correct me on this) As for coordination of these works, that is a very good idea, I'll suggest it. daveb wrote: This weekend the Met line will be closed between Wembley Park and Aldgate. This is despite that stretch of line closing almost every weekend from September 2004 to may 2005 for the Wembley rebuild. During that time Chiltern railways put on extra trains to cope with the mass of people trying to get to/from London, but as Marylebone is now closed most weekends in June/July there will be no direct link into London from Amersham southwards. Couple of questions: Was it really not possible to do this work on the Met line during the past 30 odd weekends? Who is responsible for co-ordinating work between network rail and Metronet to try and ensure this kind of thing doesn't happen? Dave |
#3
![]() |
|||
|
|||
![]()
On Mon, 13 Jun 2005 12:04:16 GMT, General Von Clinkerhoffen
wrote: It probably would have been possible to do the work during the wobble park shutdowns, but I think I'm correct in saying that the District line was shutdown over the same weekends, Not really... the Met closures were every weekend. The District/Circle ones were only on some weekends. Metrocrap probably only have enough staff for 1 weekend shutdown at a time (although someone will probably correct me on this) As for coordination of these works, that is a very good idea, I'll suggest it. daveb wrote: This weekend the Met line will be closed between Wembley Park and Aldgate. This is despite that stretch of line closing almost every weekend from September 2004 to may 2005 for the Wembley rebuild. During that time Chiltern railways put on extra trains to cope with the mass of people trying to get to/from London, but as Marylebone is now closed most weekends in June/July there will be no direct link into London from Amersham southwards. Couple of questions: Was it really not possible to do this work on the Met line during the past 30 odd weekends? Who is responsible for co-ordinating work between network rail and Metronet to try and ensure this kind of thing doesn't happen? No one, evidently. It seems an inevitable consequence of privatisation and PPP, that if there aren't financial penalties for it then they don't care about it. The passengers, sorry "customers", just don't seem to get taken into consideration. |
#4
![]() |
|||
|
|||
![]()
daveb wrote:
This weekend the Met line will be closed between Wembley Park and Aldgate. This is despite that stretch of line closing almost every weekend from September 2004 to may 2005 for the Wembley rebuild. During that time Chiltern railways put on extra trains to cope with the mass of people trying to get to/from London, but as Marylebone is now closed most weekends in June/July there will be no direct link into London from Amersham southwards. What about the Jubilee Line? Couple of questions: Was it really not possible to do this work on the Met line during the past 30 odd weekends? What are they actually doing? |
#5
![]() |
|||
|
|||
![]() "TheOneKEA" wrote in message ups.com... daveb wrote: Was it really not possible to do this work on the Met line during the past 30 odd weekends? What are they actually doing? Since when did Metronet know what they were doing, anyway? NR/Chiltern, OTOH, are busy with full commissioning of Wembley depot, decommissioning and removal of the stabling sidings on the north-west side of Marylebone station, commissioning of the new siding on the north-east side of the station etc. etc. in order to add the two new platforms, along with the associated replacement of pointwork, resignalling and so on. You can bet that they'll have all that done and Metronet will still be faffing about with the Met and Jubilee lines! ;-)) |
#6
![]() |
|||
|
|||
![]() "daveb" wrote in message ... This weekend the Met line will be closed between Wembley Park and Aldgate. This is despite that stretch of line closing almost every weekend from September 2004 to may 2005 for the Wembley rebuild. It has been longer than that - there was a replacement bus service between Harrow on the Hill and Willesden Green as long ago as June 2004. At the same time there was no service from Harrow into Euston on the WCML because that was closed at weekends too. Made it bloody awkward to get to Waterloo to catch an early Eurostar !! I'm sure that weekend closures of the Met were in force long before that. Cheerz, Baz |
#7
![]() |
|||
|
|||
![]()
In message , daveb
writes This weekend the Met line will be closed between Wembley Park and Aldgate. This is despite that stretch of line closing almost every weekend from September 2004 to may 2005 for the Wembley rebuild. During that time Chiltern railways put on extra trains to cope with the mass of people trying to get to/from London, but as Marylebone is now closed most weekends in June/July there will be no direct link into London from Amersham southwards. Couple of questions: Was it really not possible to do this work on the Met line during the past 30 odd weekends? Who is responsible for co-ordinating work between network rail and Metronet to try and ensure this kind of thing doesn't happen? Dave If you want a 21st century railway, that's the price, otherwise have four wheel coaches with gas lighting and steam hauled to boot. Your choice. -- Clive |
#8
![]() |
|||
|
|||
![]()
If you want a 21st century railway, that's the price
What? 30 weekend closures? Didn't they change the entire GWR's guage over a single weekend? |
#9
![]() |
|||
|
|||
![]()
Clive ) gurgled happily, sounding much like they
were saying : Was it really not possible to do this work on the Met line during the past 30 odd weekends? If you want a 21st century railway, that's the price OK, we've been paying the price for months now. Now - when do we get the 21st century railway? Do we have to have a second- half-of-20th railway installed first, or can we go straight to the 21st? |
#10
![]() |
|||
|
|||
![]()
In message , Clive
writes If you want a 21st century railway, that's the price, otherwise have four wheel coaches with gas lighting and steam hauled to boot. Your choice. I think it's exactly that kind of attitude within the public transport sector that explains why a section of track, that has been closed almost every weekend for about the last year, is once again being taken out of service. Just out of interest, do you work for Metronet or LUL by any chance? Most companies who had to close a section of their business over such a long period, would take advantage of that closure and undertake any other planned work (for that area) at the same time. A few weeks ago there was an TFL puff piece in the Metro about how the Wembley work had been finished on time and the weekend service would be back to normal by the end of May. Strangely enough It didn't mention that it would only be back to normal for 2 weeks :-) Dave -- Dave B |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Baker St.(Met) and Met operations | London Transport | |||
London - Met widened lines query. | London Transport | |||
Reduction in Chiltern Services and Funding of Shared Met Line | London Transport | |||
Chiltern Lines - TESCO Project Tunnel Collapses | London Transport | |||
met and jubilee lines working | London Transport |