Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#15
![]() |
|||
|
|||
![]()
I'm a bit confused by what's been happening as reported on this thread.
Can someone more knowledgeable than me clarify, please? As I understand it, Heathrow connect started with the summer timetable, running to Heathrow. Owing to problems, timekeeping left a lot to be desired. OK so far. As from some date (unknown to me) the service was truncated at Hayes whilst signalling problems are sorted out at Heathrow. The problem is that the signal will not let trains out of the headshunt. This is where I get confused. How could the service have run at all, however badly, if this was the problem? Is it that the service hasn't yet *actually* run to Heathrow? Is the problem something else, such as an exceptionally long setting/release time allowing *a* service but not the planned one? Awkward Slough IECC staff? Anytheng else? Help! Thanks, PhilD -- |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Jewellery can be purchased that will have holiday themes, likeChristmas that depict images of snowmen and snowflakes, and this type offashion jewellery can also be purchased with Valentine's Day themes, as wellas themes and gems that will go with you | London Transport | |||
Oyster readers on Heathrow Connect | London Transport | |||
Travelcards on Heathrow Express/Connect during LU closure | London Transport | |||
Heathrow Connect when? | London Transport | |||
Heathrow Connect service | London Transport |