London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #2   Report Post  
Old July 22nd 05, 04:35 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2004
Posts: 947
Default Complaints prompt upgrade for station

burkey ) gurgled happily, sounding much like they were
saying :

Decorating on the stairwells cannot begin immediately as health and
safety assessments must be carried out first.


shakes head sadly

There's a *world* of difference between ensuring that you don't
"accidentally" kill people and having to delay painting some flamin'
railings for "H&S assessments".

Is this the first time Silverlink have ever painted railings?
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Paddington H&C station upgrade Mr Thant London Transport 13 December 26th 09 12:38 PM
Victoria station upgrade approved Paul Scott London Transport 2 February 6th 09 11:06 PM
Euston Station Underground upgrade a joke. [email protected] London Transport 43 November 12th 07 10:51 AM
Tube complaints - help with research Tim Wild London Transport 3 May 15th 04 10:17 PM


All times are GMT. The time now is 07:48 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017