Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Cannot find any real info as to when the tunnel is or isn't
functioning. The sign at the southern approach is usually blank, or maybe the rain washes the chalk marks off. The BBC website says "Northbound Tunnel closed Tuesday nights with a contraflow for north and southbound traffic in the southbound tunnel. On Wednesday and Thursday nights one lane is closed in the southbound tunnel" So, Mon-Thurs it's not completely closed in either direction? "Every Friday, Saturday & Sunday night the A102 Blackwall Tunnel Northern Approach is closed for maintenance southbound from A13 East India Dock Road to A2203 / Tunnel Avenue. The closure runs from 9pm to 8am and can cause significant delays. This work is expected to continue until September 2006." So Fri-Sun southbound is closed from 9pm, and northbound is fully operational? I feel sorry for foreign drivers trying to fathom this lot out. "The northern approach is closed southbound" Eh? Confirmation of this, or a link to proper information, would be appreciated. Thanks |
#2
![]() |
|||
|
|||
![]()
Google for "blackwall tunnel closure", it's the first hit.
I think your summary is about right. -- Malcolm wrote in message oups.com... Cannot find any real info as to when the tunnel is or isn't functioning. The sign at the southern approach is usually blank, or maybe the rain washes the chalk marks off. The BBC website says "Northbound Tunnel closed Tuesday nights with a contraflow for north and southbound traffic in the southbound tunnel. On Wednesday and Thursday nights one lane is closed in the southbound tunnel" So, Mon-Thurs it's not completely closed in either direction? "Every Friday, Saturday & Sunday night the A102 Blackwall Tunnel Northern Approach is closed for maintenance southbound from A13 East India Dock Road to A2203 / Tunnel Avenue. The closure runs from 9pm to 8am and can cause significant delays. This work is expected to continue until September 2006." So Fri-Sun southbound is closed from 9pm, and northbound is fully operational? I feel sorry for foreign drivers trying to fathom this lot out. "The northern approach is closed southbound" Eh? Confirmation of this, or a link to proper information, would be appreciated. Thanks |
#3
![]() |
|||
|
|||
![]()
Cheers Malcolm, but nothing about single lane northbound on
Tuesdays....... |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Blackwall Tunnel | London Transport | |||
Blackwall Tunnel | London Transport | |||
Petition against C-Charge for Blackwall Tunnel | London Transport | |||
blackwall tunnel morning lane closures | London Transport | |||
Blackwall Tunnel Sunday Nights | London Transport |