London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #14   Report Post  
Old August 10th 05, 10:18 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Apr 2004
Posts: 164
Default Thameslink 2000 Blackfriars


Roland Perry wrote:

I see that this is creaking into existence once more (it's only been
postponed three times already). Will trains from the GN lines continue
to terminate at Kings Cross, until the Thameslink works are complete, or
will some of them start going through?


The map on the National Express Group website shows the GN and existing
Thameslink routes as continuing to be self-contained, albeit coming
tantalisingly close at KX and Moorgate:

http://www.nationalexpressgroup.com/...hise_route.pdf

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Exciting news on Thameslink 2000 (now "Thameslink Project") [email protected] London Transport 5 May 5th 06 07:45 PM
Thameslink 2000 and other animals Dave Arquati London Transport 28 April 13th 05 09:27 AM
Thameslink 2000 Christine London Transport 10 September 10th 04 10:18 AM
THAMESLINK 2000 Christine London Transport 2 December 1st 03 08:24 PM
New Thameslink 2000 proposals? s c London Transport 0 October 22nd 03 01:57 PM


All times are GMT. The time now is 10:22 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017